My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2005-04-04
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2005
>
04/04/2005
>
FULL PACKET_2005-04-04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:56:30 PM
Creation date
3/30/2005 12:16:36 PM
Metadata
Fields
Template:
City Clerk
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
444
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />NOVEMBER 22, 2004 <br />PAGE 6 OF 10 <br /> <br />36. Prior to approval of final design plans, the project applicant <br />shall submit the proposed project to the Orange County Airport <br />Land Use Commission for review and consistency of FAA criteria <br />and regulations. <br /> <br />37. Prior to approval of final design plans, the project applicant <br />shall file a Notice of Proposed Construction with the FAA. <br />Conditions placed on the project by the FAA shall be <br />incorporated in the final design and construction of the <br />proposed project. <br /> <br />38. Prior to the issuance of grading permits, the project <br />applicant shall provide proof of coverage under NPDES General <br />Construction Activity Storm Water Permit, which includes a <br />copy of the project permit number and two copies of the Storm <br />Water Pollution Prevention Plan. <br /> <br />39. Prior to the issuance of grading permits, the project <br />applicant shall provide a NPDES post construction storm water <br />management plan per Orange County Drainage Area Management <br />Plan (DAMP) that includes all Structural and Non-Structural <br />Best Management Practices for the proposed project. <br /> <br />40. Submit and have approved a surface drainage/utility plan to <br />include all structural Best Management Practices. <br /> <br />41. Provide two copies of the Water Quality Management Plan (WQMP) <br />that includes a description of all-applicable Structural and <br />Non-Structural Best Management Practices, which would apply to <br />this project. <br /> <br />42. Prior to issuance of grading permits, the project applicant <br />shall receive approval of NPDES Permit for the State Regional <br />Water Quality Control Board for the proposed on-site <br />dewatering operations. <br /> <br />43. Building plans for the proposed proj ect shall reflect that <br />restaurant uses be fitted with a grease interceptor to the <br />size and capacity as designated by the Building Safety <br />Division of the City of Santa Ana to mitigate impacts on the <br />local sanitary sewer system and regional water quality. Such <br />grease interceptor shall be regularly maintained so as to <br />remain fully functional. <br /> <br />75C-126 <br />
The URL can be used to link to this page
Your browser does not support the video tag.