My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2005-04-04
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2005
>
04/04/2005
>
FULL PACKET_2005-04-04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:56:30 PM
Creation date
3/30/2005 12:16:36 PM
Metadata
Fields
Template:
City Clerk
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
444
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />NOVEMBER 22, 2004 <br />PAGE70F10 <br /> <br />44. The proposed proj ect would be subj ect to City of Santa Ana <br />Federal Clean Water Protection Enterprise Fees. <br /> <br />45. Prior to issuance of a grading permit, the proj ect applicant <br />shall submit a final surface water runoff evaluation for <br />review and approval showing existing and proposed facilities <br />and methods of draining the site without exceeding the <br />capacity of any street or adjacent storm drain facility. <br /> <br />46. <br /> <br />Prior to the issuance of building <br />applicant shall be responsible for the <br />storm drain systems. <br /> <br />permits, the project <br />construction of onsite <br /> <br />47. Prior to the recordation of a final subdivision map or the <br />issuance of any grading permits, an Acoustical Analysis Report <br />shall be submitted to the City of Santa Ana Engineering <br />Department for approval. The Acoustical Analysis Report shall <br />describe the acoustical design features of the structures <br />required to satisfy an interior noise level of no more than 45 <br />dBA CNEL. In addition, the Acoustical Analysis Report shall <br />contain satisfactory evidence indicating that the sound <br />attenuation measures specified in the approved acoustical <br />reports have been incorporated into the design of the project. <br />These measures are applicable to those residential units that <br />directly overlook Macarthur Boulevard and/or the SR-55 <br />Freeway. Such measures could include (but not be limited to) <br />the inclusion of forced-air ventilation allowing window and <br />doors to remain shut, the use of acoustic-rated windows and/or <br />sliding door assemblies, a reduction in the physical size of <br />the windows and/or sliding doors, the use of solid core <br />exterior doors, the use of gaskets and seals on all external <br />doors and windows, and any other measures deemed acceptable to <br />the City of Santa Ana that will attain the 45-dBA CNEL <br />interior noise level. <br /> <br />48. All construction equipment shall be properly maintained and <br />tuned to minimize noise emissions. <br /> <br />49. All equipment shall be fitted with properly operating mufflers <br />and air intake silencers no less efficient than those <br />originally installed. <br /> <br />75C-127 <br />
The URL can be used to link to this page
Your browser does not support the video tag.