My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2005-04-04
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2005
>
04/04/2005
>
FULL PACKET_2005-04-04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:56:30 PM
Creation date
3/30/2005 12:16:36 PM
Metadata
Fields
Template:
City Clerk
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
444
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />NOVEMBER 22, 2004 <br />PAGE90FIO <br /> <br />59. The elevator adjacent to drop-off area shall be designed with <br />a glass backed elevator cab. <br /> <br />60. Prior to the issuance of building permits, the project <br />developer shall submit evidence to the City of Santa Ana of a <br />fee payment between the developer and the SAUSD to offset <br />school facility related impacts. <br /> <br />61. Prior to the issuance of certificate of occupancy permits the <br />project developer shall meet Municipal Code Parkland <br />requirements through the dedication of land and/or the payment <br />of park impact fees, as determined by the Planning Division. <br /> <br />62. <br /> <br />63. <br /> <br />Prior to the issuance of building <br />applicant shall provide a fair share <br />restriping of the southbound approach <br />provide one exclusive left turn lane, <br />lane and one exclusive right turn lane. <br /> <br />permits the project <br />contribution for the <br />along Grand Avenue to <br />one shared left turn <br /> <br />Prior to the issuance of building <br />applicant shall provide a fair share <br />restriping of the southbound approach of <br />provide two exclusive left turn lanes, <br />through lane and dual right lanes. <br /> <br />permits, the project <br />contribution for the <br />Imperial Promenade to <br />a shared left turn- <br /> <br />64. The project applicant shall be subject to Transportation <br />System Improvement Fees and San Joaquin Hills corridor Fees. <br /> <br />65. Prior to final approval of the proposed project by the City of <br />Santa Ana, the project applicant shall receive all necessary <br />approvals from the FAA and the Orange County Airport Land Use <br />Commission. <br /> <br />66. <br /> <br />Prior to the issuance <br />applicant shall coordinate <br />Department regarding the <br />proposed water distribution <br /> <br />of grading permits, the project <br />with the City of Santa Ana Water <br />depths, locations and sizes of <br />facilities. <br /> <br />67. Water conservation measures recommended by the State <br />Department of Water Resources and applicable state laws <br />requiring the use of water-efficient plumbing fixtures and <br />recommendations for low-water-using landscape shall be <br />incorporated into the project design as appropriate. GPM are <br />prohibited. <br /> <br />75C-129 <br />
The URL can be used to link to this page
Your browser does not support the video tag.