Laserfiche WebLink
<br />applicant shall file a Notice final design <br />of Proposed Construction plans <br />with the FAA. Conditions <br />placed on the project by the <br />FAA shall be incorporated in <br />the final design and <br />construction of the proposed <br />project. <br />Prior to the issuance of Prior to Public Works <br />grading permits, the project Grading Agency <br />applicant shall provide proof Permits <br />of coverage under NPDES <br />General construction Activity <br />Storm Water Permit, which <br />includes a copy of the project <br />permit number and two <br />copies of the Storm Water <br />Pollution Prevention Plan. <br />Prior to the issuance of Prior to Public Works <br />grading permits, the project Grading Agency <br />applicant shall prepare an Permits <br />NPDES post-construction <br />storm water management <br />plan per Orange County <br />Drainage Area Management <br />Plan (DAMP) that includes <br />all structural and non- <br />structural Best Management <br />Practices for the project. <br />a. Submit and have <br />approved a surface <br />drainage/utility plan to <br />include all structural Best <br />management Practices. <br />b. Provide two copies <br /> of the Water Quality <br /> Management Plan <br /> (WQMP) that <br /> includes a <br /> description of all- <br /> applicable <br /> Structural and Non- <br /> <br />6 <br /> <br />75C-144 <br />