My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2005-04-04
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2005
>
04/04/2005
>
FULL PACKET_2005-04-04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:56:30 PM
Creation date
3/30/2005 12:16:36 PM
Metadata
Fields
Template:
City Clerk
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
444
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Comment <br /> <br />1. <br /> <br />2. <br /> <br />3. <br /> <br />4. <br /> <br />5. <br /> <br />6. <br /> <br />7. <br /> <br /> <br />Comment Letter <br />California Regional Water Quality Control Board <br />December 19, 2003 <br /> <br />Response <br /> <br />The Mitigated Negative Declaration prepared for the proposed project <br />includes mitigation requiring the applicant to receive approval of a <br />NPDES Permit for onsite dewatering activities and the discharge of <br />groundwater effluent into the local storm water system. <br /> <br />The Mitigated Negative Declaration prepared for the proposed project <br />includes mitigation requiring the applicant to show proof of coverage <br />under NPDES General Construction Activity Storm Water Permit. <br /> <br />The preliminary hydrology report prepared for the proposed project <br />identifies that the project would increase the surface water flows from the <br />project site by 6.39 CFS. The project site is situated within a developed <br />office center with existing drainage facilities. According to the City's <br />Public Works Department, the existing drainage facilities would be able to <br />accommodate increased surface water runoff from the project site. <br /> <br />Comment Noted. <br /> <br />The Mitigated Negative Declaration prepared for the proposed project <br />includes mitigation requiring the applicant to prepare a NPDES post- <br />construction storm water management plan per the Orange County <br />Drainage Area Management Plan that includes all structural and non- <br />structural Best Management Practices. <br /> <br />See above response. <br /> <br />As mentioned above the Mitigated Negative Declaration prepared for the <br />proposed project includes mitigation requiring the applicant to receive <br />approval of a NPDES Permit for onsite dewatering activities and the <br />discharge of groundwater effluent into the local storm water system. <br /> <br />CUP 04-24/DA 04-3mM 04-5 <br />SPR 04-6NA 04-11/Z0A 04-5 <br />EXHIBIT 21 <br />pfJ5e-155 <br />
The URL can be used to link to this page
Your browser does not support the video tag.