My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
W. Koo & Associates 3
Clerk
>
Contracts / Agreements
>
INACTIVE CONTRACTS (Originals Destroyed)
>
W-X (INACTIVE)
>
W. Koo & Associates 3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2024 2:51:18 PM
Creation date
3/30/2005 4:38:01 PM
Metadata
Fields
Template:
Contracts
Company Name
W. Koo & Associates, Inc.
Contract #
A-2005-012
Agency
Public Works
Council Approval Date
1/18/2005
Expiration Date
12/31/2005
Insurance Exp Date
9/30/2009
Destruction Year
2016
Notes
Amended by A-2005-012-01, -02
Document Relationships
W. Koo & Associates 3a
(Amended By)
Path:
\Contracts / Agreements\ INACTIVE CONTRACTS (Originals Destroyed)\W-X (INACTIVE)
W. KOO & ASSOCIATES 3B
(Amended By)
Path:
\Contracts / Agreements\ INACTIVE CONTRACTS (Originals Destroyed)\W-X (INACTIVE)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Santa Ana Bridge Rehabilitation and Bike Trail Structure 12/27/2004 <br />1.3 PRELIMINARY RIGHT-OF-WAY RESEARCH AND UTILITY COORDINATION <br />We will collect the right-of-way information from City, Caltrans and County to identify the <br />property owners, easements, and/or airspace rights. This data will be added to the base <br />map. For each bridge, we will define the needed right-of-way (partial or complete fee <br />take, temporary and/or permanent easements, and airspace rights), current type of <br />ownership, and whether relocation, relinquishments, abandonments, on -site <br />construction, etc. will be required. We will determine who will transfer the right-of-way, <br />the state or the local agency. This information will be summarized along with the <br />estimated costs on Caltrans Right -of -Way Data Sheet for each structure. <br />It is assumed that the City will complete all necessary utility coordination <br />DELIVERABLE: ROW DATA SHEET <br />1.4 ROADWAY <br />All bridge improvement plans will be based on an assumed centerline and stationing on <br />the streets. Consultant will perform roadway design services to complete the curb and <br />sidewalk improvements behind the bridge abutments to provide ADA conformance <br />connections to existing sidewalks. <br />1.5 HYDRAULIC ANALYSIS, HYDROLOGY AND STORM DRAIN DESIGN <br />No Hydraulic analysis of the Santa Ana -Delhi Channel will be conducted. It is assumed <br />the existing high water elevation will be provided by OCFCD. <br />A Storm Water Data Report will be prepared. The Project Planning Design Guide <br />(PPDG) was revised in September 2002 to incorporate storm water quality control at the <br />planning and design stage. The new standards require the preparation of a Storm Water <br />Data Report (SWDR) describing the drainage, potential water quality issues, and <br />proposed construction and permanent Best Management Practices (BMP's). This report <br />is accompanied by checklists including all water quality items to be addressed, a cost <br />estimate for the storm water quality efforts and construction costs, and constitutes <br />"Appendix E" of the PPDG. This report will describe the drainage and water quality <br />conditions of the project area, evaluate potential issues and propose best management <br />practices (BMP's) to mitigate existing and future conditions, as well as construction <br />related water quality prevention requirements. Also part of the NPDES requirements, the <br />NPDES Information Submittal form will be prepared. <br />DELIVERABLE: STORM WATER DATA REPORT <br />1.6 RAILROAD COORDINATION <br />The Flower Street Bike Trail Structure may encroach on UPRR ROW as well as require <br />the modification of the existing Railroad Crossing Guard Gates. WKA assumes the City <br />will obtain all the necessary permits and access permissions from the UPRR and PUC <br />as part of the bikeway design, as well as the design for all required RR crossing gates. <br />The WKA team will provide the necessary information to the City for UPRR coordination. <br />For each of the four structures, the existing drainage conditions will be reviewed <br />
The URL can be used to link to this page
Your browser does not support the video tag.