My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
W. Koo & Associates 3
Clerk
>
Contracts / Agreements
>
INACTIVE CONTRACTS (Originals Destroyed)
>
W-X (INACTIVE)
>
W. Koo & Associates 3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2024 2:51:18 PM
Creation date
3/30/2005 4:38:01 PM
Metadata
Fields
Template:
Contracts
Company Name
W. Koo & Associates, Inc.
Contract #
A-2005-012
Agency
Public Works
Council Approval Date
1/18/2005
Expiration Date
12/31/2005
Insurance Exp Date
9/30/2009
Destruction Year
2016
Notes
Amended by A-2005-012-01, -02
Document Relationships
W. Koo & Associates 3a
(Amended By)
Path:
\Contracts / Agreements\ INACTIVE CONTRACTS (Originals Destroyed)\W-X (INACTIVE)
W. KOO & ASSOCIATES 3B
(Amended By)
Path:
\Contracts / Agreements\ INACTIVE CONTRACTS (Originals Destroyed)\W-X (INACTIVE)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 <br />W. KOO AND ASSOCIATES <br />MANHOUR ESTIMATES BY <br />CATEGORY <br />.] qF.:w. :x m.iXw Bridge Rehabilitation and Bike Trail Structure Services <br />CONTRACT NO. <br />McFadden, Fifth, Flower Rehab & Flower Bike Trall Structure <br />City of Santa Ana <br />City of Santa Ana <br />w <br />LL <br />0 <br />m <br />0 <br />O <br />W <br />N <br />m <br />= <br />Q. <br />m <br />m <br />c <br />W <br />w <br />< <br />f <br />C <br />Q. <br />W <br />C <br />J <br />J <br />m <br />9 <br />0 <br />x <br />O <br />F <br />O <br />F <br />O <br />a <br />to <br />tl <br />� <br />U <br />70 <br />139 <br />435 <br />291 <br />674 <br />1,609 <br />146,921 <br />Task TASK DESCRIPTION <br />No. <br />2 <br />- <br />2 <br />- <br />- <br />4 <br />484 <br />1.1. Project Kickoff Meeting <br />1.2�� Field Survey <br />- <br />- <br />4 <br />- <br />- <br />4 <br />372 <br />1.3'1I Preliminary ROW & Utility Coord <br />1 <br />4 <br />6 <br />- <br />- <br />11 <br />1,227 <br />1.4I Roadway <br />- <br />- <br />2 <br />- <br />- <br />2 <br />186 <br />1.5,Hydraulics <br />1 <br />- <br />2 <br />- <br />- <br />3 <br />335 <br />1.61 Railroad Coordination <br />- <br />- <br />2 <br />- <br />- <br />2 <br />186 <br />I <br />1.7i Geotechincal Study <br />1 <br />- <br />8 <br />- <br />- <br />9 <br />893 <br />1.& Concept Alternative Study <br />- <br />- <br />- <br />- <br />- <br />- <br />0 <br />1.9 Bridge T Selecalion <br />6 <br />15 <br />28 <br />30 <br />72 <br />151 <br />13.692 <br />:5;:7ab'bi:SubT:Otlt! <br />11 <br />1 19 <br />54 <br />1 30 <br />72 <br />186 <br />17,375 <br />2.11 ISA <br />- <br />- <br />2 <br />- <br />- <br />2 <br />186 <br />2.2i MNES <br />- <br />- <br />1 <br />- <br />- <br />1 <br />93 <br />2.3 Section 106 <br />- <br />- <br />3 <br />- <br />- <br />3 <br />279 <br />2.4 Water Quality Study <br />- <br />- <br />2 <br />- <br />- <br />2 <br />186 <br />2.4 NEPA Compliance <br />2 <br />- <br />6 <br />- <br />- <br />8 <br />856 <br />2.5CEQA Compliance <br />2 <br />6 <br />8 <br />856 <br />:;:;G.atid�Subfdfat, <br />4 <br />20 <br />24 <br />2.456 <br />3.1 Site Visit <br />- <br />- <br />4 <br />- <br />- <br />4 <br />372 <br />3.2 is Meeting <br />- <br />- <br />4 <br />- <br />- <br />4 <br />372 <br />3.3 Any Corps 404 Permit <br />- <br />- <br />1 <br />- <br />- <br />1 <br />93 <br />3.4 Fish & Game Permit <br />- <br />- <br />1 <br />- <br />- <br />1 <br />93 <br />3.5I Water Quality Certification- <br />- <br />1 <br />- <br />- <br />1 <br />93 <br />3.6 Resource Aaencv Pemnittino <br />1 <br />2 <br />3 <br />335 <br />:: i:Cahoi:SidtYotat <br />1 <br />13 <br />14 <br />1,358 <br />4.1' Bridge Plans <br />19 <br />53 <br />115 <br />101 <br />281 <br />569 <br />51,336 <br />4.2; Preliminary Estimates <br />2 <br />- <br />- <br />36 <br />- <br />38 <br />3.106 <br />4.3• Draft Structure SSP <br />1 <br />10 <br />36 <br />47 <br />4.797 <br />:;;;Gabtia:3liilitdlAF <br />22 <br />63 <br />151 <br />137 <br />281 <br />654 <br />59,239 <br />Bridge Plans <br />10 <br />27 <br />40 <br />47 <br />150 <br />274 <br />24,686 <br />5.11 <br />5.2 <br />Preliminary Estimates <br />1 <br />- <br />- <br />24 <br />38 <br />63 <br />5.137 <br />5.3 <br />Draft Structure SSP <br />1 <br />6 <br />16 <br />23 <br />. 2,417 <br />12 <br />33 <br />56 <br />71 <br />188 <br />360: <br />32,240 <br />6.1 <br />Bridge Plans <br />5 <br />9 <br />27 <br />16 <br />55 <br />112 <br />10,184 <br />6.2 <br />Preliminary Estimates <br />- <br />- <br />- <br />16 <br />- <br />16 <br />1,248 <br />6.3 <br />Draft Structure SSP <br />1 <br />5 <br />8 <br />14 <br />1,543 <br />ljfftp <br />66 <br />14 <br />35 <br />32 <br />55 <br />142 <br />12,975 <br />VA 2 1 OWN <br />2-Vial <br />Bridge Plans <br />4 <br />1 <br />6 <br />3 <br />18 <br />32 <br />2,994 <br />7.1 <br />7.2 <br />Preliminary Estimates <br />1 <br />- <br />- <br />8 <br />- <br />9 <br />773 <br />7.3 <br />Draft Structure SSP <br />1 <br />5 <br />8 <br />14 <br />1,543 <br />::;:rlaAei'sti/Dl6taf <br />6 <br />6 <br />14 <br />11 <br />18 <br />55 <br />5,310 <br />. • <br />r <br />Construction Meetings <br />2 <br />- <br />8 <br />- <br />- <br />10 <br />1,042 <br />8.1 <br />8.2 <br />Respond to RFI <br />2 <br />- <br />16 <br />10 <br />- <br />28 <br />2,566 <br />8.3 <br />Review Shop Drawings <br />2 <br />- <br />32 <br />- <br />- <br />34 <br />3,274 <br />8.4� <br />Prepare As -Built Plans <br />2 <br />4 <br />36 <br />60 <br />102 <br />9086 <br />>::Fahiii:Slibtbial <br />8 <br />4 <br />92 <br />10 <br />60 <br />174 <br />1 15.968 <br />
The URL can be used to link to this page
Your browser does not support the video tag.