My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
W. Koo & Associates 3
Clerk
>
Contracts / Agreements
>
INACTIVE CONTRACTS (Originals Destroyed)
>
W-X (INACTIVE)
>
W. Koo & Associates 3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2024 2:51:18 PM
Creation date
3/30/2005 4:38:01 PM
Metadata
Fields
Template:
Contracts
Company Name
W. Koo & Associates, Inc.
Contract #
A-2005-012
Agency
Public Works
Council Approval Date
1/18/2005
Expiration Date
12/31/2005
Insurance Exp Date
9/30/2009
Destruction Year
2016
Notes
Amended by A-2005-012-01, -02
Document Relationships
W. Koo & Associates 3a
(Amended By)
Path:
\Contracts / Agreements\ INACTIVE CONTRACTS (Originals Destroyed)\W-X (INACTIVE)
W. KOO & ASSOCIATES 3B
(Amended By)
Path:
\Contracts / Agreements\ INACTIVE CONTRACTS (Originals Destroyed)\W-X (INACTIVE)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 <br />W. KOO AND ASSOCIATES <br />PROFESSIONAL FEE PROPOSAL <br />FOR <br />R4? kEeTi;i Bridge Rehabilitation and Bike Trail Structure Serv,CONTRACT NO 0 <br />McFadden, Fifth, Flower Rehab & Flower Bike Trail Structure <br />CE fN3 ;:;:;;:;:;I City of Santa Ana1111/f1R>;> <br />City of Santa Ana <br />Prep. by: D. Weddell Date: 10/25/2004 <br />RFP No Date: <br />Provide Environmental and PS&E services for the rehabilitation of McFadden Ave over the Sana Ana <br />River, Fifth Street over theSanta Ana River, and Flower Street over the Santiago Creek, as well as <br />design services for the Flower Street Bike Strucutre over the Santa Ana -Delhi Channel. <br />___._. .......................... <br />Na�t3... ...itd..AA..... »:>:>::»::>:z:;»:>i;i:»:: <br />y <br />5 <br />L <br />0 <br />U <br />d <br />N <br />m <br />J <br />g <br />m <br />m <br />No. <br />Classification <br />(n <br />U <br />1 <br />Project Manager <br />70 <br />149.00 <br />10,430 <br />2 <br />Senior Engineer <br />139 <br />130.00 : <br />18,070 <br />3 <br />Project Engineer <br />435 <br />93.00 <br />40,455 <br />4 <br />Assistant Engineer <br />291 <br />7&00 <br />22,698 <br />5 <br />CAD <br />674 <br />82.00 <br />55,268 <br />1) <br />Salary Cost <br />1,609 <br />01 <br />Reproductions <br />891 <br />02 <br />Xerox <br />330 <br />03 <br />Computer <br />115 <br />04 <br />Travel/Transportation <br />183 <br />05 <br />SubConsultants <br />128,876 <br />06 <br />Special Deliveries <br />700 <br />FEE BREAKDOWN <br />146,921 <br />DESIGN SERVICES $ 261,841 <br />CONSTRUCITON SERVICES $ 15,96f <br />(a) Other direct cost breakdowns are shown on Page 4. <br />
The URL can be used to link to this page
Your browser does not support the video tag.