My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
31A - 1939 S. SUSAN STREET
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2005
>
04/18/2005
>
31A - 1939 S. SUSAN STREET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:56:07 PM
Creation date
4/12/2005 1:31:48 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
31A
Date
4/18/2005
Destruction Year
2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />MARCH 23, 2005 <br />PAGE 1 OFl <br /> <br />Conditions for Approval <br /> <br />Tentative Parcel Map No. 2005-01 is approved subject to compliance, to the <br />reasonable satisfaction of the Planning Manager, with all applicable <br />sections of the Santa Ana Municipal Code, the California Administrative <br />Code, the Uniform Fire Code, the Uniform Building Code and all other <br />applicable regulations. <br /> <br />The applicant must comply in full with each and every condition listed <br />below prior to exercising the rights conferred by this approval. <br /> <br />The applicant must remain in compliance with all conditions listed below <br />throughout the life of the tentative parcel map. Failure to comply with <br />each and every condition may result in the revocation of the tentative <br />parcel map. <br /> <br />A. <br /> <br />4. <br /> <br />Planning Division <br /> <br />1. <br /> <br />Two copies of the recorded final parcel map shall be submitted <br />each to the Planning Division, Building Division and Public <br />Works Agency within 10 days of recordation. <br /> <br />2. <br /> <br />The tentative tract map, final map and all improvements <br />required to be made or installed by the subdivider shall be in <br />accordance with the requirements and design standards and <br />specifications of the City of Santa Ana and the requirements <br />of the State Subdivision Map Act. <br /> <br />3. <br /> <br />Prior to recordation of final map, file, process and record a <br />reciprocal ingress and egress easement for the use and <br />maintenance of the shared driveway access between Parcell and <br />Parcel 2. <br /> <br />After proj ect occupancy, landscaping is to be maintained in <br />accordance with the landscape plan approved for the proj ect . <br />This shall include the minimum levels of plant materials shown <br />on the landscape plan and installed at the time of occupancy. <br /> <br />PM 05-1 <br />ffÄ~'fð <br />
The URL can be used to link to this page
Your browser does not support the video tag.