My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23A - NEW HORIZONS NEIGHBORHOOD STREET IMPROVEMENTS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2005
>
06/06/2005
>
23A - NEW HORIZONS NEIGHBORHOOD STREET IMPROVEMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:55:05 PM
Creation date
5/31/2005 5:11:03 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
23A
Date
6/6/2005
Destruction Year
2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />REQUEST FOR <br />COUNCIL ACTION <br /> <br />~ <br />~ <br /> <br />CITY COUNCIL MEETING DATE: <br /> <br />CLERK OF COUNCIL USE ONLY: <br /> <br />JUNE 6, 2005 <br />TITLE: <br /> <br />APPROVED <br /> <br />CONTRACT AWARD FOR NEW <br />HORIZONS NEIGHBORHOOD STREET <br />IMPROVEMENTS (PROJECT NOS. <br />04-7711, 04-7712 AND 04-7713) <br /> <br />o As Recommended <br />o As Amended <br />o Ordinance on 15t Reading <br />o Ordinance on 2nd Reading <br />o Implementing Resolution <br />o Set Public Hearing For <br /> <br /> <br />/ <br /> <br />CONTINUED TO <br /> <br />----.., <br /> <br />FILE NUMBER <br /> <br />RECOMMENDED ACTION <br /> <br />1. Award a contract <br />responsible bidder, <br />estimated amount of <br />street improvements. <br /> <br />to LH Engineering Company, Inc., the lowest <br />in accordance with unit bid prices for an <br />$1,066,976.50 for the New Horizons Neighborhood <br /> <br />2. Approve a Funding Analysis with a total estimated construction cost <br />of $1,333,400. <br /> <br />DISCUSSION <br /> <br />This proj ect provides for construction of new pavement, wheel <br />ramps, and missing sidewalks and replacement of damaged sidewalks, <br />gutters, crossgutters, and driveway approaches on various streets <br />New Horizons Neighborhood (Exhibit 1). In addition, a storm drain <br />will be constructed to alleviate flooding. Once completed, <br />improvements will enhance the ride quality, surface drainage and <br />appearance of the neighborhood. <br /> <br />chair <br />curbs, <br />in the <br />system <br />these <br />visual <br /> <br />The Notice Inviting Bids was advertised on April 6 and 8, 2005, and bids <br />were opened on April 22, 2005. A summary of the bid invitations mailed, <br />the bids received, and the bid results follows. <br /> <br />Santa Ana Contractors receiving notices: 4 <br />Contractors requesting bidding documents: 9 <br />Bids received: 4 <br />Bids received from Santa Ana Contractors: 0 <br /> <br />23A-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.