My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75B - 3500 WEST LAKE CENTER DRIVE
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2005
>
06/06/2005
>
75B - 3500 WEST LAKE CENTER DRIVE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:55:20 PM
Creation date
6/1/2005 9:41:13 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
75B
Date
6/6/2005
Destruction Year
2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. . <br /> <br />. <br /> <br />770 <br /> <br />DI~ ~FJ' (Aucus. 1, J~90) <br /> <br />JDr.I'!' n <br /> <br />LAKE CBftBR. 8PBC:rP%C DBVBLOP'lDT <br />KI'1'IGA'1'IOH KOBIlfOR.IlIG p~ <br /> <br />EARTH RESOURCES <br /> <br />1. Grading shall be conducted by the project applicant in accordance with plans prepared <br />by . civil engineer and based on recommendations of a soil engineer and an <br />engineering geoJopt subsequent 10. the completion of I comprebeDSive son and <br />geologic: invcstiaation Cor lhe proposed .UVdures. PermaDent reproducible copies oC <br />the -Approved IS Bunt- vading plans on standard size sheets shall be furnished by tbe <br />project applicant to the Building DcpartmcnL ", <br /> <br />Responsible Party: <br /> <br />Prior to grading permit iss~ance 8: during <br />grading operation <br /> <br />Grading plan check and periodic field <br />inspection during grading operation <br /> <br />Sr. ~ Ian Olcck Engineer, Building Oi\ision <br /> <br />Jiminr of ImplementationNerif'icRtion: <br /> <br />Method of Verification: <br /> <br />Verification ~8mes &: Dates): <br /> <br />2. A complete erosion study shaU be prepared by the project applicant prior to tbe start <br />of any grading activities to minimize the erosion potential created during development, <br />and &rading opcntions by the applicant shaJJ be in conformance with aU City of Santa <br />Ana ordinanc:cs pertaining to grading. <br /> <br />J1min~ of ImplementationNerificlItion: Prior to grading permit issuance. and <br />during grading operation <br /> <br />Method or Verification: Grading plan check and periodic field <br />inspections <br /> <br />Responsible Paf1Y: Sr. Plan 0Kd Engineer, Building Division <br /> <br />y~"ficatinn (Name &. Dale): <br /> <br />88SMMP <br /> <br />1 <br /> <br />72~7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.