My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75B - 3500 WEST LAKE CENTER DRIVE
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2005
>
06/06/2005
>
75B - 3500 WEST LAKE CENTER DRIVE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:55:20 PM
Creation date
6/1/2005 9:41:13 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
75B
Date
6/6/2005
Destruction Year
2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />771- <br /> <br />DRAFT (Au&:ust 7, 1990) <br /> <br />3. Possible water erosion during construction shall be mitigated by the installation oC <br />temporary erosion control devicea by the project applicant. as required by the State <br />. Regional Water Quality Control Board. ' <br /> <br />Timilll of ImplemcntBtionNerific8tion: <br /> <br />P.;or to grading pennit Luuance and during <br />grading operation <br /> <br />Grading plan check and periodic field <br />inspections <br /> <br />Method of Verification: <br /> <br />Responsible Party: <br /> <br />Sr. Plan Cleek Engineer, Building Division <br /> <br />Verification (Name &. Date): <br /> <br />4. Utilization of desiltation dcvices such as sandbags in areas that may discharge into <br />city streets shall be implemented by the project applicant prior to the commencement <br />of grading activities. <br /> <br />Timine of ImplementationNcrification: <br /> <br />Prior to grading permit issuance <br /> <br />Method of Verification: <br /> <br />Grading plan check and field inspection <br />Sr. Plan Check Engineer, Building Division <br /> <br />Responsible Party: <br /> <br />Verification (Name & Date): <br /> <br />S. The grading plan prepared by the applicant shall include a description of haul routes, <br />access points to thc sitc, and a watering and sweeping program designed to minimize <br />impacts of haul operations. <br /> <br />Timb'i of ImplementationNerifiC:Btion: <br /> <br />Prior to approval of any grading permits <br />and implementation during grading phase <br /> <br />Grading plan check and periodic field <br />inspections <br /> <br />r <br />I <br /> <br />I <br />11 <br /> <br />Method of Verification: <br /> <br />Rcsponsible Party: <br /> <br />Sr. Plan OJeck Engineer. BuDding Dhojsion <br /> <br />Verification QJame &. Date): <br /> <br />88SMMP <br /> <br />2 <br /> <br />7~i948 <br />
The URL can be used to link to this page
Your browser does not support the video tag.