My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75B - 3500 WEST LAKE CENTER DRIVE
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2005
>
06/06/2005
>
75B - 3500 WEST LAKE CENTER DRIVE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:55:20 PM
Creation date
6/1/2005 9:41:13 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
75B
Date
6/6/2005
Destruction Year
2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />.' <br /> <br />772 <br /> <br />DRAFT (Aul:ust '. 1990) <br /> <br />6. All structures shall be designed by the applicant in ac:c.ordance with the seismic design <br />provisions of the Uniform Building <;odes to promote safety in the event of an <br />earthquake. . <br /> <br />Timine of ImplementationNerification: <br /> <br />Prior to approval of any grading permits <br />and implementation dud..g grading phase <br /> <br />Method of Verification: <br /> <br />Grading plan check and periodic field <br />inspections <br /> <br />Responsible Party: <br /> <br />Sr. Plan Cleek Engineer, Building Division <br /> <br />Verification (Name & Date): <br /> <br />WATER <br /> <br />7. Prior to issuance of grading permits, onsile drainage improvement plans prepared by <br />the applicant shall be reviewed and approved by the City of Santa Ana Public Works <br />Department, . and said onsile improvements shall be constructed by the project <br />applicant. <br /> <br />Timini of ImplementationNerification: <br /> <br />Prior to grading permit issuance <br /> <br />Method of Verification: <br /> <br />Grading plan check and field inspection <br /> <br />Respon!iiible Parties: <br /> <br />Sr. Plan Cleek Engineer, Building Division <br />&. Manager. Engineering Services <br /> <br />Verification (Name & Date): <br /> <br />8. AU development within the Santa Ana River floodplain shall be carefully reviewed by <br />the City of Santa Ana to ensure that it is located and designed to minimize potential <br />damage from flooding and to ensure that such development does not endanger other <br />ar~~. <br /> <br />TIminr of JrnplementationNerification: <br /> <br />Prior to grading permit issuance <br /> <br />Method of Verification: <br /> <br />Grading plan check and field inspection <br /> <br />Sr. Plan Oleek Engineer. Building Division <br />& Manager, Engineering Services <br /> <br />Responsible PartIes: <br /> <br />Verification (Name & Date): <br /> <br />88SMMP. <br /> <br />3 <br /> <br />75~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.