My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75B - 3500 WEST LAKE CENTER DRIVE
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2005
>
06/06/2005
>
75B - 3500 WEST LAKE CENTER DRIVE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:55:20 PM
Creation date
6/1/2005 9:41:13 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
75B
Date
6/6/2005
Destruction Year
2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. .7.76 <br /> <br />DRAI'" (Au&,:ust 7, 1990) <br /> <br />TRAFFlClCIRCULA nON <br /> <br />18. With thc first building permit for thc proposed project, the project applicant shall <br />construct 8 traffic signal at the intcrsection DC Susan Street/Sunnower Avenue in <br />accordance with standard traffic signal warrants. Under the terms of a pending <br />reimbursement agreement between the cities of Santa Ana and Costa Mesa. the <br />project applicant shall install, and provide initial costs for, this traffic signal but shall <br />eventually be reimbursed Cor all but thc .Cair sharc. of the signal costs associated with <br />the proposed Lakc Centcr project. <br /> <br />Timinr of ImplementationNerification: <br /> <br />Concurrent with first building permit <br />construction <br /> <br />" <br /> <br />Method of Verification: <br /> <br />Improvements plan check and field <br />inspection <br /> <br />Responl'ible Parties: <br />Verification (Name & Date): <br /> <br />Manager, Enginecring Scrvices <br /> <br />19. The projcct applicant shall install multiway (4-way) "stop" signage at the intersection <br />of Lakc Center and Susan Strcet. . <br /> <br />Timini of ImplemenlationNerification: <br /> <br />Prior to first building permit issuance <br /> <br />Method of Verification: <br /> <br />Improvements plan check and field <br />inspection <br /> <br />Responsible Parties: <br /> <br />Sr. Plan Check Engineer. Building Division <br />& Manager, Engineer Services <br /> <br />Verification (Name & Date): <br /> <br />20. Thc project applicant shall post a faithful performance bond [or thc future installation <br />of a traffic signal at Lakc Center and MacArthur Boulevard. This intersection shall <br />be monitored as thc project is constructed for satisfaction of signal warrant <br />requirements and the signal shall be installed as warranted. <br /> <br />Timine of ImplementationNerification: Prior to grading permit issuance <br /> <br />Method of Verification: Wriuen evidence provided by applicant <br /> <br />Re.~pon~ihle Panies: Sr. Plan Cleek Engineer. Building Division <br />. &. Manager, Enginecr Services <br /> <br />Verification ()lame & Date): <br /> <br />885MMP <br /> <br />7 <br /> <br />7~4P3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.