My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75B - 3500 WEST LAKE CENTER DRIVE
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2005
>
06/06/2005
>
75B - 3500 WEST LAKE CENTER DRIVE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:55:20 PM
Creation date
6/1/2005 9:41:13 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
75B
Date
6/6/2005
Destruction Year
2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />777 <br /> <br />DRAFT (AulDst 7, 1990) <br /> <br />21. The project applicant shall pay the Oty of Santa Ana transportation system <br />improvement fees which contribute funding towards needed areawide transportation <br />improvements. <br /> <br />1 <br />I <br />i <br />i <br /> <br />TimiD' of ImplemcntationNcrification: <br /> <br />Prior to grading permit issuance <br /> <br />R~poDsible Panies: <br /> <br />Written evidence provided by applicant &. <br />City Manager's Office <br /> <br />Sr. Plan Clcck Engineer. Building Division <br />&. Managec. Engineer Services <br /> <br />Method of Verification: <br /> <br />Verification (Name &. Date): <br /> <br />" <br /> <br />22. The project applicant shall provide plans for and install a bus stop shelter at the <br />existing bus stop location at Susan StreetJSunfiowcr Avenue in accordance with Orange <br />County Transit District standards. Said plans shall be reviewed and approved by the <br />City of Santa Ana and OCID prior to issuance of building permits. <br /> <br />Timine of ImplementationNerific8tion: <br /> <br />Prior to building permit issuance <br /> <br />Method of Verification: <br /> <br />Written evidence provided by applicant & <br />oern <br /> <br />Responsible Parties: <br /> <br />Sr. Plan Check Engineer, Building Division <br />& Manager. Engineering Services <br /> <br />Verification (J'olame &. Date): <br /> <br />23. The project applicant shan implement the proposed Transportation Demand <br />Management (1DM) Plan for the new development proposed within lhct.akc Center <br />specific development area. The roM Plan shall be administered by an onsite <br />coordinator who shall be tbe responsibility of the property owner. <br /> <br />Timinr of Implcment8tionNerification: <br /> <br />Ongoing during life of project <br /> <br />.,- <br />I <br />I <br />! <br />i <br />; <br /> <br />Method of Verification: <br /> <br />Written evidence provided by applicant on <br />an annual basis <br /> <br />Re$}..>nsible Parties: <br /> <br />Manager. Engineering Services" Manager, <br />Planning Department <br /> <br />Verification (Name" Date): <br /> <br />G:88SMMP.BB <br /> <br />8 <br /> <br />7~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.