My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
URS CORPORATION 1C - 2005
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2017
>
URS CORPORATION 1C - 2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2016 1:22:29 PM
Creation date
6/1/2005 2:15:46 PM
Metadata
Fields
Template:
Contracts
Company Name
URS Corporation
Contract #
A-2005-094
Agency
Public Works
Council Approval Date
5/2/2005
Destruction Year
2011
Notes
Amends A-2001-170C, A-2003-198, A-2004-075
Document Relationships
URS CORPORATION 1 - 2001
(Amends)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2017
URS CORPORATION 1A - 2003
(Amends)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2017
URS CORPORATION 1B - 2004
(Amends)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
tai <br />education 1.r <br />r <br />Engineering ;p <br />2.9 Construction Engineering Services <br />For most projects, we would propose to assist the City with the administration of the construction project. <br />Since we are located so close to most of the projects, we will be immediately available to attend site visits or <br />meetings as required. We will also have the opportunity to periodically observe the construction as it <br />progresses and will report back to the City if any abnormal conditions are identified. <br />2.10 Final As -Built Drawings <br />After the construction is complete, a final set of as -built drawings will be prepared from red -line markups <br />maintained by the contractor during construction. Typically, as -built plans are entered into the CADD files <br />and saved on diskettes for delivery to the City. This way the City has a permanent record of the as -built <br />conditions, as well as a convenient resource for performing future projects that expand upon the constructed <br />improvements. <br />Page 6 <br />_ <br />-- <br />-._ <br />Page 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.