Laserfiche WebLink
Jack Waldron, PE <br />Project Principal <br />preliminary and final design of two segments of the San Joaquin <br />—Hills Transportation Corridor (SJHTC). The project consisted of <br />the development of three miles of a tollroad through a developing <br />area of Orange County, California. The project includes two <br />interchanges, eight bridges and tunnels and two miles of frontage <br />roads. The work is being performed as part of a design/build <br />consortium under contract to the Orange County Transportation <br />Corridor Agency. The design requires adherence to State standards <br />and Caltrans oversight. <br />• San Joaquin Hills Transportation Corridor, Orange County, <br />California. Quality Control Manager for the conceptual, <br />preliminary and final design of two segments of the San Joaquin <br />Hills Transportation Corridor (SJHTC). The project consisted of <br />the development of three miles of a tollroad through a developing <br />area of Orange County, California. The project includes two <br />interchanges, eight bridges and tunnels and two miles of frontage <br />roads. The work is being performed as part of a design/build <br />consortium under contract to the Orange County Transportation <br />Corridor Agency. The design requires adherence to State standards <br />and Caltrans oversight. <br />• Santiago Canyon Road Alignment Study, Orange County, <br />California. Quality Control Manager for developing preliminary <br />alignment plans and a preferred alignment for approximately a <br />seven -mile realignment of this road as a major arterial. <br />Zz <br />DU <br />1.680 f Monument Boulevarsi ,�:__� _ -- <br />- Pleasant Hill, Callfomia.Pry'ec> . art V94 sc t <br />a two-mile seemcnt of inners c� _ 8Qfr sixes i, ed arse - si - <br />�`reed <br />one. apiary to ten� _ r <br />lanes. The projc:t also included a Rew rlian Fnmy e- <br />_. - widening of two bridges, including -a bridge over Ae Santa Fe <br />Railroad tracks running parallel-tothe Ecewa}rzght-61, <br />• On -Gaff Contracts,.-PS&.Es -for Storm _Damage <br />v.s. Southern California, Corfracs03ES�t-Cfvs. - _ <br />_. <br />-Pr <br />_ <br />Manager responsible for _ completing pians, spe- Canons ar?� <br />_ -- - -- - <br />estimates for numerous major storm damage repair site and paving`' <br />sites located in various counties in California. Some of the work <br />included designing repairs for large slide / slipout sites and placing <br />RSP in river environments. <br />Y:\2001-Proposals\City of Santa Ana On -Call Engccnng\resumcs\Waldron, Jack.doc <br />