Laserfiche WebLink
Jack Waldron, PE <br />Project Principal <br />Areas of Expertise Mr. Waldron has 20 years of experience in the complete range of <br />design, planning and engineering services for highway and other <br />♦ Highway Design development projects including site plan reviews, cost estimates, <br />scheduling, roadway access, utilities, construction staging, drainage and <br />♦ Transportation Planning grading. Additional services include quantity and cost estimating, <br />♦ Project Management resident quality control inspection during construction <br />Education <br />Representative Experience <br />B.S./1979/Civil Engineering, <br />Palos Verdes Drive Street Improvements, Rancho Palos Verdes, <br />Pennsylvania State University <br />California. Project Manager responsible for alignment corrections, <br />intersection configurations, pavement reconstruction and <br />Registration <br />rehabilitation of various roads on the Palos Verdes Peninsula. <br />Professional Civil Engineer, <br />Xerox Centre, Santa Ana, California. Project Manager for the civil <br />1984, California No. 37366 <br />engineering of a 10 -acre, 15 -story office center and parking <br />structure near the Santa Ana / Newport Freeway Interchange. <br />Professional Affiliations <br />Provided preliminary engineering services for the entire site, final <br />American Association of <br />engineering and construction staking for Phase One Development. <br />Airport Executives, Member <br />The complete range of site development services included <br />preliminary site plan reviews, cost estimates, scheduling, final <br />American Society of Civil <br />engineering, surveying and agency approval processing. Civil <br />Engineers, Member <br />improvements included Cabrillo Park Drive extension, the <br />American Society of Military <br />widening of First Street and freeway grading. <br />Engineers, Member <br />Xerox Corporation Office Building, Santa Ana, California. Project <br />Manager for the design of site improvements for the eight -acre <br />Years Experience - <br />�. <br />Xerox Admtn>stiaa4r _:f �#Cat}t fICSana, a.. Ther = - <br />_ <br />T URS -_14__ _ , <br />parking I& c eatg� stn cyst gradin-= ,' crr <br />.. - <br />Others 7 <br />architectural mo icanoti$.-ate proi,ect -was. -ons. <br />-: _ <br />-_. _ <br />an exi <br />17ui%sliit i�% e t>v i rc M4- <br />Affirtsting�3ffi�c <br />" Fu�rt ris <br />fot 300 Ears and to aft, _ -Z__" Tnutxz c der pit — > <br />cURSonstruction. ° Building entrancesarx3 parking were `tipgrader� <br />? <br />current ADA standards. -The -project re -rt saMo�a s from the <br />City of Santa Ana and coardina£ion wi£lCaftrans." _ _. . <br />Lakeshore Tgwers� Irvine,; ect Mana r-responsl�l�% <br />- <br />for engineering this 15-2,acre high --me ce t�eaelupme ...: ` <br />1al_61ore' owers con---- of ttvo 164 6rq office [a vers;suiace - <br />parking lot, a parking structure, a restaurant, a 100,000 -square -foot <br />health club and a 2.6 -acre man-made lake running the entire <br />length of the project. FoothilI Transportation Corridor, Orange <br />County, California. Project Manager for the plans, specifications, <br />and estimates for the construction of the Alton and Portola <br />Parkway interchange section of a tollway through a currently <br />undeveloped hillside area of Orange County. This section includes <br />three interchanges of either urban or diamond configuration to <br />Caltrans specifications. <br />• San Joaquin Hills Transportation Corridor, Orange County, <br />California. Quality Control Manager for the conceptual, <br />MIS Y12001-Proposals\City of Santa Ma On -Call Engeering\resumes\Waldron. Jack.doc <br />