| 
								    Jack Waldron, PE 
<br />Project Principal 
<br />Areas of Expertise Mr. Waldron has 20 years of experience in the complete range of 
<br />design, planning and engineering services for highway and other 
<br />♦ Highway Design development projects including site plan reviews, cost estimates, 
<br />scheduling, roadway access, utilities, construction staging, drainage and 
<br />♦ Transportation Planning grading. Additional services include quantity and cost estimating, 
<br />♦ Project Management resident quality control inspection during construction 
<br />Education 
<br />Representative Experience 
<br />B.S./1979/Civil Engineering, 
<br />Palos Verdes Drive Street Improvements, Rancho Palos Verdes, 
<br />Pennsylvania State University 
<br />California. Project Manager responsible for alignment corrections, 
<br />intersection configurations, pavement reconstruction and 
<br />Registration 
<br />rehabilitation of various roads on the Palos Verdes Peninsula. 
<br />Professional Civil Engineer, 
<br />Xerox Centre, Santa Ana, California. Project Manager for the civil 
<br />1984, California No. 37366 
<br />engineering of a 10 -acre, 15 -story office center and parking 
<br />structure near the Santa Ana / Newport Freeway Interchange. 
<br />Professional Affiliations 
<br />Provided preliminary engineering services for the entire site, final 
<br />American Association of 
<br />engineering and construction staking for Phase One Development. 
<br />Airport Executives, Member 
<br />The complete range of site development services included 
<br />preliminary site plan reviews, cost estimates, scheduling, final 
<br />American Society of Civil 
<br />engineering, surveying and agency approval processing. Civil 
<br />Engineers, Member 
<br />improvements included Cabrillo Park Drive extension, the 
<br />American Society of Military 
<br />widening of First Street and freeway grading. 
<br />Engineers, Member 
<br />Xerox Corporation Office Building, Santa Ana, California. Project 
<br />Manager for the design of site improvements for the eight -acre 
<br />Years Experience - 
<br />�. 
<br />Xerox Admtn>stiaa4r _:f �#Cat}t fICSana, a.. Ther = - 
<br />_ 
<br />T URS -_14__ _ , 
<br />parking I& c eatg� stn cyst gradin-= ,' crr 
<br />.. - 
<br />Others 7 
<br />architectural mo icanoti$.-ate proi,ect -was. -ons. 
<br />-: _ 
<br />-_. _ 
<br />an exi 
<br />17ui%sliit i�% e t>v i rc M4- 
<br />Affirtsting�3ffi�c 
<br />" Fu�rt ris 
<br />fot 300 Ears and to aft, _ -Z__" Tnutxz c der pit — > 
<br />cURSonstruction. ° Building entrancesarx3 parking were `tipgrader� 
<br />? 
<br />current ADA standards. -The -project re -rt saMo�a s from the 
<br />City of Santa Ana and coardina£ion wi£lCaftrans." _ _. . 
<br />Lakeshore Tgwers� Irvine,; ect Mana r-responsl�l�% 
<br />- 
<br />for engineering this 15-2,acre high --me ce t�eaelupme ...: ` 
<br />1al_61ore' owers con---- of ttvo 164 6rq office [a vers;suiace - 
<br />parking lot, a parking structure, a restaurant, a 100,000 -square -foot 
<br />health club and a 2.6 -acre man-made lake running the entire 
<br />length of the project. FoothilI Transportation Corridor, Orange 
<br />County, California. Project Manager for the plans, specifications, 
<br />and estimates for the construction of the Alton and Portola 
<br />Parkway interchange section of a tollway through a currently 
<br />undeveloped hillside area of Orange County. This section includes 
<br />three interchanges of either urban or diamond configuration to 
<br />Caltrans specifications. 
<br />• San Joaquin Hills Transportation Corridor, Orange County, 
<br />California. Quality Control Manager for the conceptual, 
<br />MIS Y12001-Proposals\City of Santa Ma On -Call Engeering\resumes\Waldron. Jack.doc 
<br />
								 |