Jack Waldron, PE
<br />Project Principal
<br />Areas of Expertise Mr. Waldron has 20 years of experience in the complete range of
<br />design, planning and engineering services for highway and other
<br />♦ Highway Design development projects including site plan reviews, cost estimates,
<br />scheduling, roadway access, utilities, construction staging, drainage and
<br />♦ Transportation Planning grading. Additional services include quantity and cost estimating,
<br />♦ Project Management resident quality control inspection during construction
<br />Education
<br />Representative Experience
<br />B.S./1979/Civil Engineering,
<br />Palos Verdes Drive Street Improvements, Rancho Palos Verdes,
<br />Pennsylvania State University
<br />California. Project Manager responsible for alignment corrections,
<br />intersection configurations, pavement reconstruction and
<br />Registration
<br />rehabilitation of various roads on the Palos Verdes Peninsula.
<br />Professional Civil Engineer,
<br />Xerox Centre, Santa Ana, California. Project Manager for the civil
<br />1984, California No. 37366
<br />engineering of a 10 -acre, 15 -story office center and parking
<br />structure near the Santa Ana / Newport Freeway Interchange.
<br />Professional Affiliations
<br />Provided preliminary engineering services for the entire site, final
<br />American Association of
<br />engineering and construction staking for Phase One Development.
<br />Airport Executives, Member
<br />The complete range of site development services included
<br />preliminary site plan reviews, cost estimates, scheduling, final
<br />American Society of Civil
<br />engineering, surveying and agency approval processing. Civil
<br />Engineers, Member
<br />improvements included Cabrillo Park Drive extension, the
<br />American Society of Military
<br />widening of First Street and freeway grading.
<br />Engineers, Member
<br />Xerox Corporation Office Building, Santa Ana, California. Project
<br />Manager for the design of site improvements for the eight -acre
<br />Years Experience -
<br />�.
<br />Xerox Admtn>stiaa4r _:f �#Cat}t fICSana, a.. Ther = -
<br />_
<br />T URS -_14__ _ ,
<br />parking I& c eatg� stn cyst gradin-= ,' crr
<br />.. -
<br />Others 7
<br />architectural mo icanoti$.-ate proi,ect -was. -ons.
<br />-: _
<br />-_. _
<br />an exi
<br />17ui%sliit i�% e t>v i rc M4-
<br />Affirtsting�3ffi�c
<br />" Fu�rt ris
<br />fot 300 Ears and to aft, _ -Z__" Tnutxz c der pit — >
<br />cURSonstruction. ° Building entrancesarx3 parking were `tipgrader�
<br />?
<br />current ADA standards. -The -project re -rt saMo�a s from the
<br />City of Santa Ana and coardina£ion wi£lCaftrans." _ _. .
<br />Lakeshore Tgwers� Irvine,; ect Mana r-responsl�l�%
<br />-
<br />for engineering this 15-2,acre high --me ce t�eaelupme ...: `
<br />1al_61ore' owers con---- of ttvo 164 6rq office [a vers;suiace -
<br />parking lot, a parking structure, a restaurant, a 100,000 -square -foot
<br />health club and a 2.6 -acre man-made lake running the entire
<br />length of the project. FoothilI Transportation Corridor, Orange
<br />County, California. Project Manager for the plans, specifications,
<br />and estimates for the construction of the Alton and Portola
<br />Parkway interchange section of a tollway through a currently
<br />undeveloped hillside area of Orange County. This section includes
<br />three interchanges of either urban or diamond configuration to
<br />Caltrans specifications.
<br />• San Joaquin Hills Transportation Corridor, Orange County,
<br />California. Quality Control Manager for the conceptual,
<br />MIS Y12001-Proposals\City of Santa Ma On -Call Engeering\resumes\Waldron. Jack.doc
<br />
|