Laserfiche WebLink
Patti Tiberi, PE <br />Civil Engineer— Street Improvements <br />The project also included traffic . signal improvements at 12 <br />-intersections and the installation of a fiber optic traffic signal <br />interconnect to provide for the sequencing of signals on Hollywood <br />Way. <br />• San Joaquin Hills Transportation Corridor, Orange County, <br />California. Design Engineer responsible for the development of <br />geometric layout plans for a 2 -mile segment of San Joaquin toll <br />road. Responsibilities also included preparation of roadway profiles, <br />superelevation, edge drain plans, and a roadway design calculation <br />report. The work prepared for the Transportation Corridor <br />Agencies (TCA) is performed in conformance with Caltrans design <br />standards and specifications. <br />t <br />State Route 91 Priority (Phase I) Sound Walls, Riverside, <br />California. Project Engineer responsible for preparation of plans, <br />specifications and cost estimates for construction of six sound wall <br />systems in the City of Riverside. Responsibilities include sound <br />wall and retaining wall design, traffic handling plans, drainage <br />analyses, and utility relocations. Her work also involved extensive <br />landscape coordination with the City of Riverside and Caltrans and <br />detailed right-of-way impact analyses involving temporary <br />construction easement. Standard special provisions and <br />construction cost estimates are prepared in conformance with <br />Caltrans guidelines. <br />Interstate 2151Los Alamos Interchange, Murrieta, Calift�rrxra. <br />Project Engineer responsible for preparation of plans, specifics <br />and cost estimates fix an interchange improvement projem <br />responsibilities include _ Geometric. layouts, gradin, elra>> -- <br />improvements, retaining wall design, utility coordination and E � -- <br />-_ <br />street improvements. <br />Interstate 15/Yuma Drive Interchange, Norco, Califonua <br />Project Engineer responsible for preparation of plans, specificatir <br />and cost estimates and providing construction services for a ae <br />interchange -construction. Design - resporial�i6ties included -- <br />wall_ design, , signing and striping, construction_ traffic conn <br />modification of ramp metering system, and planting replacement <br />Construction services included bidding assistance, review of shop <br />drawings and providing day-to-day assistance with design and <br />construction questions. <br />Interstate 10/Live Oak Canyon Road Interchange, Yucaipa, <br />California. Project Engineer responsible for studies and analyses <br />for preparation of a combined Project Study Report/Project Report <br />document for an interchange improvement. Responsibilities <br />include conceptual studies -of various interchange configurations to <br />improve traffic operations, local street improvements, utility <br />coordination, traffic management plans, and right-of-way impact <br />analysis and report preparation. <br />US YA-100I-Proposals\City of Santa Ana On -Call EngccringVcsumcs\Tiberi, Patti.doc <br />