My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
URS CORPORATION 1C - 2005
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2017
>
URS CORPORATION 1C - 2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2016 1:22:29 PM
Creation date
6/1/2005 2:15:46 PM
Metadata
Fields
Template:
Contracts
Company Name
URS Corporation
Contract #
A-2005-094
Agency
Public Works
Council Approval Date
5/2/2005
Destruction Year
2011
Notes
Amends A-2001-170C, A-2003-198, A-2004-075
Document Relationships
URS CORPORATION 1 - 2001
(Amends)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2017
URS CORPORATION 1A - 2003
(Amends)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2017
URS CORPORATION 1B - 2004
(Amends)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Patti Tiberi, PE <br />Civil Engineer— Street Improvements <br />The project also included traffic . signal improvements at 12 <br />-intersections and the installation of a fiber optic traffic signal <br />interconnect to provide for the sequencing of signals on Hollywood <br />Way. <br />• San Joaquin Hills Transportation Corridor, Orange County, <br />California. Design Engineer responsible for the development of <br />geometric layout plans for a 2 -mile segment of San Joaquin toll <br />road. Responsibilities also included preparation of roadway profiles, <br />superelevation, edge drain plans, and a roadway design calculation <br />report. The work prepared for the Transportation Corridor <br />Agencies (TCA) is performed in conformance with Caltrans design <br />standards and specifications. <br />t <br />State Route 91 Priority (Phase I) Sound Walls, Riverside, <br />California. Project Engineer responsible for preparation of plans, <br />specifications and cost estimates for construction of six sound wall <br />systems in the City of Riverside. Responsibilities include sound <br />wall and retaining wall design, traffic handling plans, drainage <br />analyses, and utility relocations. Her work also involved extensive <br />landscape coordination with the City of Riverside and Caltrans and <br />detailed right-of-way impact analyses involving temporary <br />construction easement. Standard special provisions and <br />construction cost estimates are prepared in conformance with <br />Caltrans guidelines. <br />Interstate 2151Los Alamos Interchange, Murrieta, Calift�rrxra. <br />Project Engineer responsible for preparation of plans, specifics <br />and cost estimates fix an interchange improvement projem <br />responsibilities include _ Geometric. layouts, gradin, elra>> -- <br />improvements, retaining wall design, utility coordination and E � -- <br />-_ <br />street improvements. <br />Interstate 15/Yuma Drive Interchange, Norco, Califonua <br />Project Engineer responsible for preparation of plans, specificatir <br />and cost estimates and providing construction services for a ae <br />interchange -construction. Design - resporial�i6ties included -- <br />wall_ design, , signing and striping, construction_ traffic conn <br />modification of ramp metering system, and planting replacement <br />Construction services included bidding assistance, review of shop <br />drawings and providing day-to-day assistance with design and <br />construction questions. <br />Interstate 10/Live Oak Canyon Road Interchange, Yucaipa, <br />California. Project Engineer responsible for studies and analyses <br />for preparation of a combined Project Study Report/Project Report <br />document for an interchange improvement. Responsibilities <br />include conceptual studies -of various interchange configurations to <br />improve traffic operations, local street improvements, utility <br />coordination, traffic management plans, and right-of-way impact <br />analysis and report preparation. <br />US YA-100I-Proposals\City of Santa Ana On -Call EngccringVcsumcs\Tiberi, Patti.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.