Laserfiche WebLink
Ross E. Lew, PE <br />Civil Engineer— Street Improvements <br />Areas of Expertise Mr. Lew has over 11 years of experience in Civil Engineering. His <br />technical capabilities include the management and design of highways <br />♦ Transportation Planning and streets, utility relocations and coordination, retaining and sound <br />wall designs, transportation planning, specification preparation, cost <br />♦ Highway and Street Design estimating, grading and earthwork calculations. Mr. Lew has extensive <br />♦ Utility Relocations and experience with engineering software packages, including Intergraph <br />Coordination Inroads/InXpress, AES Hydrology and HEC12. <br />♦ Specification Preparation Representative Experience <br />♦ Cost Estimating East Orange Comprehensive Plan, Orange County, California. <br />Design Engineer responsible for preliminary planning and <br />♦ Grading and Earthwork infrastructure development for a 7,000 -acre master planned <br />Calculations community project. The work included grading, hydrology, sewer, <br />water, utility, roadway design, cost estimations, earthwork <br />♦ Hydrology and Hydraulics calculation, and evaluation of alternative alignments for the <br />Eastern Transportation Corridor. These services were performed <br />Education for the Irvine Company. All work was performed to Orange <br />B.S./1990/Civil Engineering, County standards. <br />Unt v rs;t f (- 1;f " 1 <br />o I y o a t , rvine <br />Horizon Development, Orange County, California. Design <br />Registration <br />Engineer responsible for infrastructure development for a 10 -acre <br />single family tract. The work included plan preparation, sewer and <br />Professional Engineer, <br />water design, earthwork calculations, hydrology/hydraulic design <br />- California, No. 53399, 1995 <br />and quantity estimations. These services were performed for <br />William Lyon Homes, Inc. and all work was performed to Orange <br />Professional Afftrta#ion - , <br />Jaunty standards. <br />A=rzcarl J ICLj ik� I1f21 _ <br />.., _ - _ <br />_ - <br />— <br />.Citi_ of Burbank Street Improvement __ -Prosect,. Burbank- <br />�izieers - <br />California. Design Engineer respamible __for street overlays, <br />.m=uction and --widening designs. =_.ani.. storm drain _ <br />. - t�rehixccts�Etz - . <br />-improvements in the Cry of Burbank. 7 -Me work .included plan <br />issociation <br />Pre aration and quantity estimations. All work -was performed to <br />- <br />-she City of Burbank standards. <br />jety of American tary <br />- <br />Southwest Division Naval Facilities Engineering Command. <br />== DfV NAVFACENGCOM), . California ---Project Engineer <br />Experience.._: <br />responsible for .Plans, specifications --,and __ estimate_ for <br />_ <br />URS - I 1 <br />_—. <br />improvements to military facilities at various locations. The work <br />Others - 0 <br />included designs for drainage improvements using HEC12 design <br />software, grading, earthwork, pavement reconstruction, oil/water <br />collection system, fire waterline and landfill concrete cap. <br />Firm Affiliation <br />Coordination work included utility, geotechnical and <br />environmental. These services were performed for SWDIV <br />URS <br />NAVFACEGNCOM and all designs conformed to the Navy <br />standards and guidelines. Responsibilities for construction <br />coordination included response to contractor's inquiries, field <br />consultations and verifications, shop drawing and submittal reviews <br />and as -built preparations. <br />Y:\2001-Proposals\City of Santa Ana On -Call Engecring\resumcs\Lew, Ross.doc <br />