Ross E. Lew, PE
<br />Civil Engineer— Street Improvements
<br />Areas of Expertise Mr. Lew has over 11 years of experience in Civil Engineering. His
<br />technical capabilities include the management and design of highways
<br />♦ Transportation Planning and streets, utility relocations and coordination, retaining and sound
<br />wall designs, transportation planning, specification preparation, cost
<br />♦ Highway and Street Design estimating, grading and earthwork calculations. Mr. Lew has extensive
<br />♦ Utility Relocations and experience with engineering software packages, including Intergraph
<br />Coordination Inroads/InXpress, AES Hydrology and HEC12.
<br />♦ Specification Preparation Representative Experience
<br />♦ Cost Estimating East Orange Comprehensive Plan, Orange County, California.
<br />Design Engineer responsible for preliminary planning and
<br />♦ Grading and Earthwork infrastructure development for a 7,000 -acre master planned
<br />Calculations community project. The work included grading, hydrology, sewer,
<br />water, utility, roadway design, cost estimations, earthwork
<br />♦ Hydrology and Hydraulics calculation, and evaluation of alternative alignments for the
<br />Eastern Transportation Corridor. These services were performed
<br />Education for the Irvine Company. All work was performed to Orange
<br />B.S./1990/Civil Engineering, County standards.
<br />Unt v rs;t f (- 1;f " 1
<br />o I y o a t , rvine
<br />Horizon Development, Orange County, California. Design
<br />Registration
<br />Engineer responsible for infrastructure development for a 10 -acre
<br />single family tract. The work included plan preparation, sewer and
<br />Professional Engineer,
<br />water design, earthwork calculations, hydrology/hydraulic design
<br />- California, No. 53399, 1995
<br />and quantity estimations. These services were performed for
<br />William Lyon Homes, Inc. and all work was performed to Orange
<br />Professional Afftrta#ion - ,
<br />Jaunty standards.
<br />A=rzcarl J ICLj ik� I1f21 _
<br />.., _ - _
<br />_ -
<br />—
<br />.Citi_ of Burbank Street Improvement __ -Prosect,. Burbank-
<br />�izieers -
<br />California. Design Engineer respamible __for street overlays,
<br />.m=uction and --widening designs. =_.ani.. storm drain _
<br />. - t�rehixccts�Etz - .
<br />-improvements in the Cry of Burbank. 7 -Me work .included plan
<br />issociation
<br />Pre aration and quantity estimations. All work -was performed to
<br />-
<br />-she City of Burbank standards.
<br />jety of American tary
<br />-
<br />Southwest Division Naval Facilities Engineering Command.
<br />== DfV NAVFACENGCOM), . California ---Project Engineer
<br />Experience.._:
<br />responsible for .Plans, specifications --,and __ estimate_ for
<br />_
<br />URS - I 1
<br />_—.
<br />improvements to military facilities at various locations. The work
<br />Others - 0
<br />included designs for drainage improvements using HEC12 design
<br />software, grading, earthwork, pavement reconstruction, oil/water
<br />collection system, fire waterline and landfill concrete cap.
<br />Firm Affiliation
<br />Coordination work included utility, geotechnical and
<br />environmental. These services were performed for SWDIV
<br />URS
<br />NAVFACEGNCOM and all designs conformed to the Navy
<br />standards and guidelines. Responsibilities for construction
<br />coordination included response to contractor's inquiries, field
<br />consultations and verifications, shop drawing and submittal reviews
<br />and as -built preparations.
<br />Y:\2001-Proposals\City of Santa Ana On -Call Engecring\resumcs\Lew, Ross.doc
<br />
|