Laserfiche WebLink
Areas of Expertise <br />♦ Traffic & Transportation <br />Engineering & Planning <br />♦ ATMS/ATIS Design <br />Education <br />B.S./1992/Civil Engineering, <br />San Diego State University <br />Registration <br />Professional Engineer, <br />California No. C60030 <br />Professional Affiliation <br />Institute of Transportation <br />Engineers (ITE) <br />Orange County <br />Transportation Engineering <br />Council (OCTEC) <br />Keith Rand, PE <br />Traffic Studies & Design <br />Mr. Rand has over 6 years of technical experience in traffic and <br />tra asportation engineering and planning, ITS planning and design, <br />traffic signal and engineering design. His experience includes ITS <br />planning and design of ATMS/ATIS plans, specifications and estimates <br />for communication design of CCTV camera systems, changeable <br />message signs, ramp metering systems, and highway advisory radio <br />systems, using both fiber optic and twisted pair communication system <br />backbones. Mr. Rand's other project experience also includes traffic <br />signal design, bikeway design, and signing and striping plans. He <br />recently worked on the following light rail transit DEIR/DEIS projects: <br />Orange County CenterLine, Irvine Fixed Guideway and the Central <br />Phoenix/East Valley LRT. Mr. Rand is currently working a signal <br />interconnect project for the City of Solana Beach and on the Central <br />Valley ITS Strategic Plan. <br />Representative Experience <br />• Conducted and managed various traffic impact, circulation, <br />multi -modal and site access studies for residential, commercial, <br />institutional, recreational and mixed-use developments throughout <br />California and Oregon. <br />• Prepared circulation element updates for the cities of Bellflower, <br />Visalia, Salinas, and Vista. <br />Years Experience Participated in site inspection, future location planning, sizing and <br />URS - 3 evaluation: conducted meering preparations and technical paper <br />review, angregatesl _sr {oi#airrans n <br />Others - 6 =_ <br />.Diego CQuniy Dark and Ride F-asi�ilit tiidy <br />-.,. - 4UPPO ,�&e - <br />,. >—vi'S�lejts.. <br />nc4 <br />InpeA 0%11 <br />3 Prepared plans, specifications and estimates (PS&E) for the design <br />of several traffic signal design projects and signal interconnect plans <br />in addition to a Communications Master Plan. <br />• Conducted before and after floating car runs and assisted in the <br />final report preparation for a multi -jurisdictional traffic signal <br />retiming project along three corridors of MacArthur Blvd. in Irvine, <br />California. <br />YA2001-Proposals\City of Santa Ana On -Call EngccringVcsumcs\Rand, Keith.doc <br />