My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
URS CORPORATION 1C - 2005
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2017
>
URS CORPORATION 1C - 2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2016 1:22:29 PM
Creation date
6/1/2005 2:15:46 PM
Metadata
Fields
Template:
Contracts
Company Name
URS Corporation
Contract #
A-2005-094
Agency
Public Works
Council Approval Date
5/2/2005
Destruction Year
2011
Notes
Amends A-2001-170C, A-2003-198, A-2004-075
Document Relationships
URS CORPORATION 1 - 2001
(Amends)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2017
URS CORPORATION 1A - 2003
(Amends)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2017
URS CORPORATION 1B - 2004
(Amends)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Douglas E. Smith, PE <br />Traffic Studies & Design <br />Technical Committee 4A-38 <br />County of Orange including Moulton Parkway, Niguel Road and <br />and 4M-38 <br />—Alicia Parkway. <br />Council on ITS <br />• Prepared traffic control plans for the Floremount Drain project in <br />American Society of Civil <br />Downey neY for the County of Los Angelesel <br />es Department of Public <br />Engineers (Associate) <br />Works. Prepared various traffic control plans for MNWD in the <br />Orange County Traffic <br />• Responsible for the preparation of plans, specifications and <br />Engineers Council <br />estimates for the Santa Monica Boulevard (SR -2) Signal <br />Modification Project, including removal, signal, interconnect, <br />Riverside/San Bernardino <br />utility and striping plans for Caltrans, District 7. <br />Traffic Engineers Council <br />• Prepared final traffic signal, communication, signing and striping <br />ITS America <br />plans at Irvine Center Drive and Deerfield in Irvine, CA. <br />Years Experience <br />0Project Manager for the Fountain Valley Citywide Traffic Signal <br />Coordination Project. <br />URS - 4 <br />Others - 9 <br />• Principal -in -Charge of the design of traffic signal systems in <br />Oceanside and National City, CA. <br />Firm Affiliation <br />• Project Manager for the Calabasas Bikeway GAP Closure Design <br />and Citywide Master Plan Project in Calabasas, CA. <br />URS <br />• Prepared conceptual design report for Perez Road widening the <br />_ <br />City of Cathedral City. <br />• Prepared the Beverly Boulevard Neighborhood Traffic Study in the <br />City of Montebello. <br />_Pre ared tie Traffic I' _ <br />= P . _ mgacC Rnalysisc}r the Civicez ter Ma - <br />- =_ <br />_ P1 in the Otey o€1�TonvaIk. =_ <br />re #141xi - trl_ <br />�.=aridw :the <br />f• - <br />_ us <br />- <br />Thousand Oaks and FocEa in 2: anti rnt,r-,-riz-s -rT I n<. Arioslpc . _. <br />Y:\2001-Proposals\City of Santa Ana On -Call Engeenng\resumes\Smith, Douglas doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.