Laserfiche WebLink
Wong Kelly, LSlT <br />Survey/Right of Way <br />tying aerial targets for photogrammetric mapping. A Leica NA3000 <br />with certified bar code invar rods was used to perform this task to <br />National Geodetic Survey interim standards. <br />San Joaquin Hills Transportation Corridor, Orange County, <br />CA. Parry Chief responsible for providing survey services for 2.5 <br />miles of toll road in rough terrain. Survey services included photo <br />control, reprographic detail surveys, boundary and alignment <br />studies, slope staking, horizontal control finish, roadway staking, <br />subdrain staking, alluvium cleanout, topo, and staking for drainage <br />devices. Project involved cuts of up to 210 feet and fills of up to <br />110 feet while excavating 12 million yards, including 3 million <br />yards of rock. <br />State Route 30/Caltrans District 8, San Bernardino County, <br />CA. Performed above -ground and below -ground utility locations. <br />Precise levels and densification of horizontal control were achieved <br />for utility location. <br />Interstate 405/Caltrans Contract 07F742, Los Angeles, CA. <br />Parry Chief responsible for performing a GPS and terrestrial control <br />survey for the location of the centerline of I-405 and all cross <br />streets, preparing of coordinate maps, and record of survey along 1- <br />405 from Santa Monica Boulevard to Vanowen Street. All maps <br />were prepared on NAD83 based on the California High Precision <br />Geodetic Network. <br />Y:000I-Proposals\City of Santa Ana On -Call Engccring\resumcsTclly, Vuong.doc <br />