record drawings shall be updated by indicating those portions which are superseded <br />by change order drawings or final shop drawings, and by including appropriate <br />reference information describing the change orders by number and the shop <br />drawings by manufacturer, drawing, and revision numbers. <br />C. Record drawings shall be accessible to the ENGINEER at all times during the <br />construction period. <br />D. Final payment will not be acted upon until the CONTRACTOR prepared record <br />drawings have been prepared and delivered to the ENGINEER. Said up-to-date <br />record drawings shall be in the form of a set of prints with carefully plotted information <br />overlaid in red. <br />E. Upon substantial completion of the WORK and prior to final acceptance, the <br />CONTRACTOR shall finalize and deliver a complete set of record drawings to the <br />ENGINEER for transmittal to the CITY, conforming to the construction records of the <br />CONTRACTOR. This set of drawings shall consist of corrected drawings showing the <br />Record Drawings will be assumed to be correct, and the CONTRACTOR shall be <br />responsible for the accuracy of such information, and for any errors or omissions that <br />may appear on the Record Drawings as a result. <br />PART 2 — PRODUCTS (Not Used) <br />PART 3 — EXECUTION (Not Used) <br />- END OF SECTION - <br />City of Santa Ana Contractor Submittals <br />Security Management System Project Page 01300-6 <br />SantaAna SMS_01300 <br />