My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SecSol
Clerk
>
Contracts / Agreements
>
INACTIVE CONTRACTS (Originals Destroyed)
>
S (INACTIVE)
>
SecSol
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2024 2:27:40 PM
Creation date
6/23/2005 9:30:38 AM
Metadata
Fields
Template:
Contracts
Company Name
SecSol Inc, dba Security Solutions
Contract #
A-2005-113
Agency
Public Works
Council Approval Date
6/6/2005
Insurance Exp Date
3/20/2006
Destruction Year
2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01400 — QUALITY CONTROL <br />PART 1 — GENERAL <br />1.1 DEFINITION <br />A. Specific quality control requirements for the WORK are indicated throughout the <br />Contract Documents. The requirements of this Section are primarily related to <br />performance of the WORK beyond furnishing of manufactured products. The term <br />"Quality Control" includes inspection, sampling and testing, and associated <br />requirements. <br />1.2 INSPECTION AT PLACE OF MANUFACTURE <br />A. Unless otherwise indicated, all products, materials, and equipment shall be subject to <br />inspection by the ENGINEER at the place of manufacture. <br />B. The presence of the ENGINEER at the place of manufacturer, however, shall not <br />relieve the CONTRACTOR of the responsibility for furnishing products, materials, and <br />equipment that comply with all requirements of the Contract Documents. Compliance <br />is a duty of the CONTRACTOR, and said duty shall not be avoided by any act or <br />omission on the part of the ENGINEER. <br />PART 2 — PRODUCTS (Not Used) <br />PART 3 — EXECUTION <br />3.1 INSTALLATION <br />A. Inspection: The CONTRACTOR shall inspect materials or equipment upon the arrival <br />on the job site and immediately prior to installation, and reject damaged and defective <br />items. <br />B. Measurements: The CONTRACTOR shall verify measurements and dimensions of <br />the WORK, as an integral step of starting each installation. <br />C. Manufacturer's Instructions: Where installations include manufactured products, the <br />CONTRACTOR shall comply with manufacturer's applicable instructions and <br />recommendations for installation, to whatever extent these are more explicit or more <br />stringent than applicable requirements indicated in Contract Documents. <br />- END OF SECTION - <br />City of Santa Ana Quality Control <br />Security Management System Project Page 0 1400-1 <br />SantaAna_SMS_01400 <br />
The URL can be used to link to this page
Your browser does not support the video tag.