My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SecSol
Clerk
>
Contracts / Agreements
>
INACTIVE CONTRACTS (Originals Destroyed)
>
S (INACTIVE)
>
SecSol
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2024 2:27:40 PM
Creation date
6/23/2005 9:30:38 AM
Metadata
Fields
Template:
Contracts
Company Name
SecSol Inc, dba Security Solutions
Contract #
A-2005-113
Agency
Public Works
Council Approval Date
6/6/2005
Insurance Exp Date
3/20/2006
Destruction Year
2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B. Monitoring Power and Control Shutdowns: <br />Continuance of site power during this expansion process is important. Therefore, <br />CONTRACTOR shall carefully examine all work to be done in, on, or adjacent to <br />existing equipment. Work shall be scheduled subject to CITY's approval to <br />minimize required shutdown time. The CONTRACTOR shall submit a written <br />sequence and duration of activities to be performed during each site shutdown. <br />2. All switching, safety tagging, etc., required for plant shutdown or to isolate existing <br />equipment shall be performed by the CONTRACTOR. In no case begin any work <br />in, on, or adjacent to existing equipment without written authorization by the CITY <br />or ENGINEER. <br />C. Modifications to Existing Electrical Facilities: <br />1. The CONTRACTOR shall make all modifications or alterations to existing <br />electrical facilities required to successfully install and integrate the new electrical <br />equipment as shown. All modifications to existing equipment, panels, MCCs, or <br />cabinets shall be made in a professional manner with all coatings repaired to <br />match existing. The total costs for all modifications to existing electrical facilities <br />required for a complete and operating system shall be included in the <br />CONTRACTOR's original bid amount and no additional payment for this work <br />shall be authorized. The CONTRACTOR in digging trenches in order not to <br />damage existing underground utilities shall exercise extreme caution. Cost of <br />repairs of damages caused during construction shall be the CONTRACTOR's <br />responsibility. <br />2. The CONTRACTOR shall be responsible for verifying all available existing <br />circuit breakers in existing lighting panels for their intended use as required by <br />the drawings. Expenses in time for such work shall be included in the <br />CONTRACTOR's original bid amount. <br />- END OF SECTION - <br />City of Santa Ana Basic Electrical Requirements <br />Security Management System Project Page 16010-5 <br />SantaAna_SMS_16010 <br />
The URL can be used to link to this page
Your browser does not support the video tag.