Laserfiche WebLink
SECTION 16123 — WIRE AND CABLE <br />PART 1 — GENERAL <br />1.1 SECTION INCLUDES <br />A. Building wire and cable. <br />B. Instrumentation Cable <br />C. Wiring connectors and connections. <br />1.2 RELATED SECTIONS <br />A. Section 16111 - Conduit. <br />B. Section 16130 - Boxes. <br />C. Section 16195 - Identification. <br />1.3 REFERENCES <br />A. ANSI/NFPA 70 - National Electrical Code. <br />1.4 SUBMITTALS <br />A. Submit under provisions of Section 01300. <br />1.5 QUALIFICATIONS <br />A. Manufacturer: Company specializing in manufacturing products specified in this <br />Section with a minimum of three years experience. <br />1.6 REGULATORY REQUIREMENTS <br />A. Conform to requirements of ANSI/NFPA 70. <br />B. Furnish products listed and classified by Underwriters Laboratories, Inc. as suitable <br />for purpose specified and shown. <br />1.7 PROJECT CONDITIONS <br />A. Wire and cable routing shown on Drawings is approximate unless dimensioned. <br />Route wire and cable as required to best suit field conditions. <br />B. Where wire and cable routing is not shown, and destination only is indicated, <br />determine exact routing and lengths required. <br />1.8 COORDINATION <br />Uty of Santa Ana Wire and Cable <br />Security Management System Project Page 16123-1 <br />SantaAna_SMS_16123 <br />