My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-063 - Statement of Overriding Considerations for the Property Located at 1, 9 and 10 East Hutton Centre Drive
Clerk
>
Resolutions
>
CITY COUNCIL
>
2000 - 2010
>
2005
>
2005-063 - Statement of Overriding Considerations for the Property Located at 1, 9 and 10 East Hutton Centre Drive
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 12:28:13 PM
Creation date
6/28/2005 2:57:23 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
2005-063
Date
6/20/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />MacArthur Place South Findings and Facts in Support of Findings <br />Environmental Impact Report <br /> <br />4.3.11 Population and Housing <br /> <br />Based on the analysis in Section 5.9 in the ErR, the increased housing units and population <br />associated with the project would not be in conflict with the City's growth projects, nor would <br />the project displace existing residential uses. No mitigation is required. <br /> <br />4.3.12 Geology <br /> <br />Based on the analysis summarized in Section 2.7 in the ErR, there is known earthquake faults, <br />landslides or unique geologic features on the project site, nor would the proposed project <br />involves the use of alternative wastewater or septic systems. No mitigation is required. <br /> <br />4.3.13 Biological Resources <br /> <br />Based on the analysis summarized in Section 2.7 in the ErR, the MacArthur Place South project <br />would not result in significant adverse impacts related to biological resources, threatened and <br />endangered species, wetlands or habitat conservation plans. No mitigation is required. <br /> <br />4.3.15 Mineral Resources <br /> <br />Based on the analysis summarized in Section 2.7 in the ErR, the project site does not contain any <br />mineral resources. No mitigation is required. <br /> <br />5.0 MITIGATION MONITORING PROGRAM <br /> <br />When making findings, CEQA requires that a lead agency must adopt a reporting or monitoring <br />program for the changes to the project that it has adopted or made a condition of project approval <br />in order to ensure compliance during project implementation. The Mitigation Monitoring <br />Program (MMP) for the MacArthur Place South project, accompanying the Final ErR, is <br />designed to serve this purpose for the mitigation measures identified in the Final ErR. The MMP <br />requires the City to monitor mitigation measures designed to reduce or eliminate significant <br />adverse project impacts, as well as those mitigation measures designed to reduce environmental <br />impacts that are less than significant. The MMP includes all mitigation measures identified in <br />the Final ErR and has been designed to ensure compliance during implementation of the project. <br /> <br />The City finds that the impacts of the project have been mitigated to the extent feasible by the <br />mitigation measures identified in the Final ErR and the MMP. The City adopts the MMP for the <br />MacArthur Place South project. The MMP designates responsibility and the anticipated timing <br />for the implementation of mitigation measures and conditions within the jurisdiction of the City <br />of Santa Ana. That MMP is hereby adopted and its implementation is made a condition of <br /> <br />Exhibit B <br />Page 30 of 38 <br /> <br />Page 30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.