Laserfiche WebLink
<br />. <br /> <br />42. <br /> <br />43. <br /> <br />44. <br /> <br />existing soils and subterranean portions of the buildings. This design and <br />installation shall be consistent with the recommendations provided in the <br />project geotechnical report. <br /> <br />Prior to initiation of project grading, the project developer shall ensure that <br />all existing utilities will be relocated, abandoned and removed, rerouted, or <br />protected in coordination with the project developer and affected utility <br />companies. <br /> <br />Prior to issuance of a grading permit for project construction, the project <br />developer shall ensure that a Final Geotechnical Report on the project site <br />is prepared. All recommendations from this Final Geotechnical Report <br />shall be incorporated into the final grading plan for the project. <br /> <br />Prior to issuance of building permits, the project developer shall ensure <br />that all structures on the site are designed in accordance with the seismic <br />design provisions set forth in the Final Geotechnical Report and the <br />Uniform Building Code in order to promote safety in the event of a seismic <br />event. <br /> <br />45. Prior to issuance of grading permits, the project developer shall determine <br />and demonstrate to the City of Santa Ana that the foundation piles for the <br />project would not intrude into the Orange County groundwater basin. In <br />the event the foundations intrude into the groundwater basin, the project <br />developer shall obtain approval and/or permits from the Orange County <br />Water District and the Regional Water Quality Control Board. Any <br />measures required by these agencies will be incorporated into the final <br />design and construction specifications for the project. <br /> <br />. <br /> <br />46. Prior to issuance of grading permits, the project developer shall ensure <br />that provisions set forth in the Final Geotechnical Report regarding dust <br />control measures during site preparation, grading and construction are <br />incorporated into the final construction specifications for the project. <br /> <br />47. Prior to issuance of Certificate of Occupancy permits, the project <br />developer shall submit to the City of Santa Ana CC&Rs for each <br />residential project. The CC&Rs shall outline the environmental <br />awareness, conditions and Best Management Practices regarding the <br />handling and storage of hazardous materials as identified in the Water <br />Quality Management Plan for MacArthur Place South. <br /> <br />48. Prior to issuance of grading permits, the project developer shall provide <br />proof to the City of Santa Ana of an NPDES permit from the RWQCB for <br />on-site dewatering activities. <br /> <br />. <br /> <br />Exhibit "B" <br />Page 7 of 15 <br />