Laserfiche WebLink
<br />49. The residential management companies shall ensure that post- <br />construction Best Management Practices (BMP's) are strictly adhered to <br />by all building occupants and tenants. <br /> <br />50. Prior to issuance of a demolition permit, the project developer shall <br />prepare an asbestos survey to determine the presence of asbestos <br />containing building materials. The survey shall be submitted to the City's <br />Environmental Coordinator for review. If asbestos is identified, proper <br />precautions shall be taken during demolition in compliance with California <br />environmental laws, regulations and policies. <br /> <br />51. Prior to issuance of a demolition permit, the project developer shall <br />prepare a lead paint survey to determine the presence of lead based <br />paint. The survey shall be submitted to the City's Environmental <br />Coordinator for review. If lead based paint or mercury is identified, proper <br />precautions shall be taken during demolition in compliance with California <br />environmental laws, regulations and policies. <br /> <br />52. Prior to occupancy of residential units, the project developer shall ensure <br />that CC&Rs for the community homeowners associations are recorded <br />specifying maintenance responsibilities for all BMP's identified in the <br />Water Quality Management Plan. <br /> <br />53. Prior to issuance of a grading permit for the project, the project developer <br />shall prepare and submit a Notice of Intent (NOI) to the State Water <br />Resources Control Board (SWRCB). The developer will also submit the <br />NOI and the project Water Discharge identification Number (WDIN) <br />provided by the SWRCB to the City of Santa Ana City Engineer. <br /> <br />54. During all site preparation, grading and construction, the project developer <br />shall ensure that the project contractor complies with all applicable <br />requirements of the NPDES permit, the Drainage Area Management Plan <br />(DAMP), and the City's Local Implementation Plan (LIP). BMP's from the <br />DAMP and the LIP will be implemented by the project contractors, as <br />appropriate during site preparation, grading and construction. <br /> <br />55. Prior to issuance of a grading permit, the project developer shall prepare a <br />Final Storm Water Pollution Prevention Plan (SWPPP). This plan shall be <br />submitted and approved by the City Engineer prior to initiation of any <br />grading activity. The project shall maintain the SWPPP on the <br />construction site throughout the construction period. <br /> <br />56. During all site preparation, grading and construction, the project developer <br />shall ensure that its contractor implements the provisions of the SWPPP. <br /> <br />Exhibit "A" <br />Page 8 of 15 <br />