My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
31A - 3770 W. MCFADDEN AVE.
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2005
>
09/06/2005
>
31A - 3770 W. MCFADDEN AVE.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:52:49 PM
Creation date
8/31/2005 10:48:17 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
31A
Date
9/6/2005
Destruction Year
2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />e. Selecting and sizing the Treatment Control BMP's <br />f. Operation and Maintenance Plan to describe the <br />long-term operation and maintenance requirements of <br />all applicable structural BMP's and to identify the <br />entity in charge of implementation. <br /> <br />. <br /> <br />Prior to issuance of building permits, <br />shall provide payment of the Federal <br />Protection Enterprise Fee. <br /> <br />the applicant <br />Clean Water <br /> <br />· Building plans shall reflect that the kitchen for the <br />proposed project shall be fitted with a grease <br />interceptor to the size and capacity as designated by <br />the City of Santa Ana Building Division. <br /> <br />B. Substantially deplete groundwater supplies or <br />interfere substantially with groundwater recharge such <br />that there would be a net deficit in aquifer volume or <br />a lowering of the local groundwater table level. <br /> <br />Q. Have a potentially significant adverse ~pact on <br />groundwater quality? <br /> <br />No Impact <br /> <br />Construction operations for the proposed project would not <br />require de-watering activities. The long-term operation of <br />the proposed project would not have any impact on <br />groundwater supplies. Additionally, the proposed project <br />would not interfere with ground water recharge because the <br />site is not located in an area that is known to recharge <br />the ground water system. <br /> <br />c. Substantially alter the existing drainage pattern of the <br />site or area, including through the alteration of the <br />course of stream or river, or substantially increase the <br />rate or amount of surface runoff in a manner, which would <br />result in flooding on or off-site? <br /> <br />D. Create or contribute runoff water which, would exceed the <br />capacity of existing or planned stor.m water drainage <br />systems or provide substantial additional sources of <br />polluted run-off? <br /> <br />L. Result in increased impervious surfaces and associated <br />runoff? <br /> <br />15 <br /> <br />31A-39 <br />
The URL can be used to link to this page
Your browser does not support the video tag.