Laserfiche WebLink
<br />DI' \Fr (Aueust 7, J~90) <br /> <br />BXIIl:BIT D <br /> <br />LAKE CENTER SPECIFIC DEVELOPMENT <br /> <br />MITIGATION MONITORING PLAN <br /> <br />EARTH RESOURCES <br /> <br />1. Grading shall be conducted by the project applicant in accordance with plans prepared <br />by a civil engineer and based on recommendations of a soil engineer and an <br />engineering geologist subsequent to the completion of a comprehensive soil and <br />geologic invcstigation for the proposed structures. Permanent reproducible copies of <br />the 'Approved as Built' grading plans on standard size sheets shall be furnished by the <br />project applicant to the Building Department. <br /> <br />Timinv or TmplementationNerifieation: <br /> <br />Prior to grading permit issuance & during <br />grading operation <br /> <br />Method of Verification: <br /> <br />Grading plan check and periodic field <br />inspection during grading operation <br /> <br />Responsible PartY: <br /> <br />Sr. . Ian Check Engineer, Building Di-ision <br /> <br />Verification (Names & Dates): <br /> <br />2. A complete erosion study shall be prepared by the project applicant prior to the start <br />of any grading activities to minimize the erosion potential created during development, <br />and grading operations by the applicant shall be in conformance with all City of Santa <br />Ana ordinances pertaining to grading. <br /> <br />Timinv of TmplementationNerification: <br /> <br />Prior to grading permit issuance and <br />during grading operation <br /> <br />Method of Verification: <br /> <br />Grading plan check and periodic field <br />inspections <br /> <br />Responsible Pa~ <br /> <br />Sr. Plan Cleck Engineer, Building Di-ision <br /> <br />Verification (Name & Date): <br /> <br />885MMP <br /> <br />1 <br />