Laserfiche WebLink
<br />, . <br /> <br />DRAFT (August 7, 1990) <br /> <br />3. Possible water erosion during construction shall be mitigated by the installation of <br />temporary erosion control devices by the project applicant, as required by the State <br />Regional Water Quality Control Board. <br /> <br />Timin!' of ImplemcntationNerification: <br /> <br />Pr;or to grading permit issuance and during <br />grading operation <br /> <br />Method of Verification: <br /> <br />Grading plan check and periodic field <br />inspections <br /> <br />Responsible PaT\V= <br /> <br />Sr. Plan O1eck Engineer, Building Division <br /> <br />Verification (Name & Date): <br /> <br />4. Utilization of desiltation devices such as sandbags in areas that may discharge into <br />city streets shall be implemented by the project applicant prior to the commencement <br />of grading activities. <br /> <br />Timin~ of TmplementationNerification: <br /> <br />Prior to grading permit issuance <br /> <br />Method of Verification: <br /> <br />Grading plan check and field inspection <br /> <br />Responsible PartY: <br /> <br />Sr. Plan Check Engineer, Building Division <br /> <br />Verification (Name & Date): <br /> <br />5. The grading plan prepared by the applicant shall include a description of haul routes, <br />access points to the site, and a watering and sweeping program designed to minimize <br />impacts of haul operations. <br /> <br />Timin~ of TmplementationNerification: <br /> <br />Prior to approval of any grading permits <br />and implementation during grading phase <br /> <br />Method of Verification: <br /> <br />Grading plan check and periodic field <br />inspections <br /> <br />Responsible Party: <br /> <br />Sr. Plan Check Engineer, Building Division <br /> <br />Verification (Name & Date): <br /> <br />885MMP <br /> <br />2 <br />