My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CALIFORNIA PACIFIC PROPERTIES 1-1990
Clerk
>
Contracts / Agreements
>
C
>
CALIFORNIA PACIFIC PROPERTIES 1-1990
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:06:54 PM
Creation date
9/6/2005 11:32:53 AM
Metadata
Fields
Template:
Contracts
Company Name
California Pacific Properties
Contract #
A-1990-102
Agency
Planning & Building
Council Approval Date
10/1/1990
Expiration Date
12/31/2025
Destruction Year
2030
Notes
Amended A-2005-195, See file for further documentation
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />, . <br /> <br />DRAFT (August 7, 1990) <br /> <br />3. Possible water erosion during construction shall be mitigated by the installation of <br />temporary erosion control devices by the project applicant, as required by the State <br />Regional Water Quality Control Board. <br /> <br />Timin!' of ImplemcntationNerification: <br /> <br />Pr;or to grading permit issuance and during <br />grading operation <br /> <br />Method of Verification: <br /> <br />Grading plan check and periodic field <br />inspections <br /> <br />Responsible PaT\V= <br /> <br />Sr. Plan O1eck Engineer, Building Division <br /> <br />Verification (Name & Date): <br /> <br />4. Utilization of desiltation devices such as sandbags in areas that may discharge into <br />city streets shall be implemented by the project applicant prior to the commencement <br />of grading activities. <br /> <br />Timin~ of TmplementationNerification: <br /> <br />Prior to grading permit issuance <br /> <br />Method of Verification: <br /> <br />Grading plan check and field inspection <br /> <br />Responsible PartY: <br /> <br />Sr. Plan Check Engineer, Building Division <br /> <br />Verification (Name & Date): <br /> <br />5. The grading plan prepared by the applicant shall include a description of haul routes, <br />access points to the site, and a watering and sweeping program designed to minimize <br />impacts of haul operations. <br /> <br />Timin~ of TmplementationNerification: <br /> <br />Prior to approval of any grading permits <br />and implementation during grading phase <br /> <br />Method of Verification: <br /> <br />Grading plan check and periodic field <br />inspections <br /> <br />Responsible Party: <br /> <br />Sr. Plan Check Engineer, Building Division <br /> <br />Verification (Name & Date): <br /> <br />885MMP <br /> <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.