My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CALIFORNIA PACIFIC PROPERTIES 1-1990
Clerk
>
Contracts / Agreements
>
C
>
CALIFORNIA PACIFIC PROPERTIES 1-1990
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:06:54 PM
Creation date
9/6/2005 11:32:53 AM
Metadata
Fields
Template:
Contracts
Company Name
California Pacific Properties
Contract #
A-1990-102
Agency
Planning & Building
Council Approval Date
10/1/1990
Expiration Date
12/31/2025
Destruction Year
2030
Notes
Amended A-2005-195, See file for further documentation
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />, . <br /> <br />DRAFT (August 7, 1990) <br /> <br />9. The proposed project shall comply with city standards described in the General Plan <br />as they apply to buildings and parking structures located in a Doodplain. <br /> <br />Timinr of ImplementationNerification: <br /> <br />Prior to grading permit issuance <br /> <br />Method of Verification: <br /> <br />Written evidence provided by applicant <br /> <br />Responsible Parties: <br /> <br />Sr. Plan Oleck Engineer, Building Division <br />&. Manager, Engineering Services <br /> <br />Verification (Name &. Date): <br /> <br />NOISE <br /> <br />10. All construction activities shall be limited to the hours of 7:00 a.m. to 8:00 p.m" <br />Monday through Saturday. No construction shall be permitted on Sundays or federal <br />holidays. <br /> <br />Timin~ of ImplementationNerification: <br /> <br />Prior to grading permit issuance <br /> <br />Method of Verification: <br /> <br />Grading plan check and field inspection <br /> <br />Responsible Parties: <br /> <br />Sr. Plan Check Engineer, Building Division <br /> <br />Verification (Name &. Date): <br /> <br />11. Where appropriate, construction equipment shall be muffled to reduce construction <br />noise impacts. <br /> <br />Timinl1 of ImplementationNerification: <br /> <br />Prior to grading permit issuance <br /> <br />Method of Verification: <br /> <br />Grading plan check, written verification <br />provided by appliant, and field inspection <br /> <br />Responsible Parties: <br /> <br />Sr. Plan Oleck Engineer, Building Division <br /> <br />Verification (Name &. Date): <br /> <br />885MMP <br /> <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.