Laserfiche WebLink
<br />, . <br /> <br />DRAFT (August 7, 1990) <br /> <br />9. The proposed project shall comply with city standards described in the General Plan <br />as they apply to buildings and parking structures located in a Doodplain. <br /> <br />Timinr of ImplementationNerification: <br /> <br />Prior to grading permit issuance <br /> <br />Method of Verification: <br /> <br />Written evidence provided by applicant <br /> <br />Responsible Parties: <br /> <br />Sr. Plan Oleck Engineer, Building Division <br />&. Manager, Engineering Services <br /> <br />Verification (Name &. Date): <br /> <br />NOISE <br /> <br />10. All construction activities shall be limited to the hours of 7:00 a.m. to 8:00 p.m" <br />Monday through Saturday. No construction shall be permitted on Sundays or federal <br />holidays. <br /> <br />Timin~ of ImplementationNerification: <br /> <br />Prior to grading permit issuance <br /> <br />Method of Verification: <br /> <br />Grading plan check and field inspection <br /> <br />Responsible Parties: <br /> <br />Sr. Plan Check Engineer, Building Division <br /> <br />Verification (Name &. Date): <br /> <br />11. Where appropriate, construction equipment shall be muffled to reduce construction <br />noise impacts. <br /> <br />Timinl1 of ImplementationNerification: <br /> <br />Prior to grading permit issuance <br /> <br />Method of Verification: <br /> <br />Grading plan check, written verification <br />provided by appliant, and field inspection <br /> <br />Responsible Parties: <br /> <br />Sr. Plan Oleck Engineer, Building Division <br /> <br />Verification (Name &. Date): <br /> <br />885MMP <br /> <br />4 <br />