Laserfiche WebLink
<br />, . <br /> <br />DRAFf (August 7, 1990) <br /> <br />6. All structures shall be designed by the applicant in accordance with the seismic design <br />provisions of the Uniform Building Codes to promote safety in the event of an <br />earthquake. <br /> <br />Timine- of ImplementationNerification: <br /> <br />Prior to approval of any grading permits <br />and implementation duri..g grading phase <br /> <br />Method of Verification: <br /> <br />Grading plan check and periodic field <br />inspections <br /> <br />Responsible Party: <br /> <br />Sr. Plan Check Engineer, Building Division <br /> <br />Verification (Name & Date): <br /> <br />WATER <br /> <br />7. Prior to issuance of grading permits, onsite drainage improvement plans prepared by <br />the applicant shall be reviewed and approved by the City of Santa Ana Public Works <br />Department, and said onsite improvements shall be constructed by the project <br />applicant. <br /> <br />Timing- of ImplementationNerification: <br /> <br />Prior to grading permit issuance <br /> <br />Method of Verification: <br /> <br />Grading plan check and field inspection <br /> <br />Responsible Parties: <br /> <br />Sr. Plan Check Engineer, Building Division <br />& Manager, Engineering Services <br /> <br />Verification (JIlame & Date): <br /> <br />8. All development within the Santa Ana River floodplain shall be carefully reviewed by <br />the City of Santa Ana to ensure that it is located and designed to minimize potential <br />damage from flooding and to ensure that such development does not endanger other <br />aTer". <br /> <br />Timine- of ImplementationNerification: <br /> <br />Prior to grading permit issuance <br /> <br />Method of Verification: <br /> <br />Grading plan check and field inspection <br /> <br />Responsible PartIes: <br /> <br />Sr. Plan Check Engineer, Building Division <br />& Manager, Engineering Services <br /> <br />Verification (Name & Date): <br /> <br />885MMP <br /> <br />3 <br />