My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CALIFORNIA PACIFIC PROPERTIES 1-1990
Clerk
>
Contracts / Agreements
>
C
>
CALIFORNIA PACIFIC PROPERTIES 1-1990
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:06:54 PM
Creation date
9/6/2005 11:32:53 AM
Metadata
Fields
Template:
Contracts
Company Name
California Pacific Properties
Contract #
A-1990-102
Agency
Planning & Building
Council Approval Date
10/1/1990
Expiration Date
12/31/2025
Destruction Year
2030
Notes
Amended A-2005-195, See file for further documentation
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />.. <br /> <br />DRAFf (August 7, 1990) <br /> <br />24. Lighting plans prepared by the project applicant shall be revised and approved by the <br />City of Santa Ana prior to building permit issuance to ensure that pedestrian a= <br />routes to the bus stop at Sunnower and Susan are adequately illuminated. <br /> <br />Timin~ of ImplementationNerification: <br /> <br />Prior to building permit issuance <br /> <br />Method of Verification: <br /> <br />Plan check and field inspection <br /> <br />Re.~ponsible Parties: <br /> <br />Manager, Engineering Services & Sr. Plan <br />Check Engineer, Building Division <br /> <br />Verification (Name & Date): <br /> <br />" <br /> <br />25. A stop sign shall be installed by the project applicant at all driveway locations to <br />control outbound traffic nows. The City of Santa Ana Public Works Department <br />shall review and approve placement of stop signs prior to issuance of building permits. <br /> <br />Tirnin~ of ImplementationNerification: <br /> <br />Prior to building permit issuance <br /> <br />Method of Verification: <br /> <br />Improvements plan ch<.:ck and field <br />inspection <br /> <br />Responsible Parties: <br /> <br />Manager, Engineering Services & Sr. Plan <br />Check Engineer, Building Division <br /> <br />Verification (Name & Date): <br /> <br />26. Landscape plantings and signs shall be limited by the project applicant to 36 inches in <br />height v.;thin 25 feet of project driveways to ensure good visibility. The City of Santa <br />Ana Planning Department shall re\;ew and approve landscape plans prior to issuance <br />of grading permits, <br /> <br />Timin~ of ImplementationNerification: <br /> <br />Prior to building permit issuance <br /> <br />Method of Verification: <br /> <br />Landscape plans check and field inspection <br /> <br />Responsible Parties: <br /> <br />Manager, Engineering Services & Sr. Plan <br />Check Engineer, Building Division <br /> <br />Verification (Name & Date): <br /> <br />885MMP <br /> <br />9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.