My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CALIFORNIA PACIFIC PROPERTIES 1-1990
Clerk
>
Contracts / Agreements
>
C
>
CALIFORNIA PACIFIC PROPERTIES 1-1990
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:06:54 PM
Creation date
9/6/2005 11:32:53 AM
Metadata
Fields
Template:
Contracts
Company Name
California Pacific Properties
Contract #
A-1990-102
Agency
Planning & Building
Council Approval Date
10/1/1990
Expiration Date
12/31/2025
Destruction Year
2030
Notes
Amended A-2005-195, See file for further documentation
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />.' <br /> <br />DRAFT (August 7, 1990) <br /> <br />27, To ensure smooth traffic operations for vehicles entering and exiting the site, a striped <br />median shall be provided by the project a"plicant on Susan Street. The City of Santa <br />Ana Public Works Department shall review and approve onsite roadway improvements <br />prior to issuance of building permits. <br /> <br />Timin~ of ImplementationNerification: <br /> <br />Prior to building permit issuance <br /> <br />Method of Verification: <br /> <br />Improvements plan check and field <br />inspection <br /> <br />Responsihle Parties: <br /> <br />Manager, Engineering Services & Sr. Plan <br />Check Engineer, Building Division <br /> <br />Verification (Name & Date): <br /> <br />AIR QUALITY <br /> <br />28. The applicant shall implement fugitive dust suppression measures in a=rdance with <br />South Coast Air Quality Management District's Rule 403. Implementation of these <br />measures shall be monitored and reported to the City of Santa Ana. <br /> <br />Timinv of ImplementationNerification: <br /> <br />Prior to grading permit issuance <br /> <br />Method of Verification: <br /> <br />Grading plan check and field inspection <br /> <br />Responsihle Parties: <br /> <br />Sr. Plan Check Engineer, Building Division <br /> <br />Verification (Name & Date): <br /> <br />29. Prior to the issuance of building permits for any new industrial uses, the applicant <br />shall provide evidence to the City of Santa Ana demonstrating compliance with all <br />SCAQMD Regulations, including Regulation XIII, New Source Review, as applicable. <br /> <br />Timin\, of ImplementationNerification: <br /> <br />Prior to building permit issuance <br /> <br />Method of Verification: <br /> <br />Wriuen evidence provided by applicant <br /> <br />Responsihle Parties: <br /> <br />Sr. Plan Check Engineer, Building Division <br /> <br />Verification (Name &. Date): <br /> <br />885MMP <br /> <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.