My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CALIFORNIA PACIFIC PROPERTIES 1-1990
Clerk
>
Contracts / Agreements
>
C
>
CALIFORNIA PACIFIC PROPERTIES 1-1990
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:06:54 PM
Creation date
9/6/2005 11:32:53 AM
Metadata
Fields
Template:
Contracts
Company Name
California Pacific Properties
Contract #
A-1990-102
Agency
Planning & Building
Council Approval Date
10/1/1990
Expiration Date
12/31/2025
Destruction Year
2030
Notes
Amended A-2005-195, See file for further documentation
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />., <br /> <br />.. .... " <br />. <br /> <br />. <br /> <br />DRAFT (August 7, 1990) <br /> <br />39. Prior to building permit issuance, the project applicant sha1l consult with Southern <br />California Edision (SCE) and Southern California Gas (SCG) representatives to ensure <br />the proposed project design is compatible with existing electrical and natural gas <br />. services, respectively, and to reduce impacts of possible short-term outages to existing <br />customers during construction. <br /> <br />Timini of ImplementationNerification: <br /> <br />Prior to building permit issuance <br /> <br />Method of Verification: <br /> <br />Improvements plan check and wrillen <br />verification from Southern California <br />Edision and Southern California Gas <br /> <br />Responsible Parties: <br /> <br />Sr. Plan Check Engineer, Building Division <br /> <br />Verification (Name & Date): <br /> <br />40. Prior to issuance of building permits, the City of Santa Ana sha1l determine through <br />plan rcvicv.'S that installation by the project applicant of needed onsite electrical and <br />natural gas s)'Stems to serve the project sha1l be coordinated with insta1lation of other <br />utilities. <br /> <br />Timin!.' of ImplementationNerification: <br /> <br />Prior to building permit issuance <br /> <br />Method of Verification: <br /> <br />Improvements plan check and field <br />inspection <br /> <br />Responsible Parties: <br /> <br />Sr. Plan Check Engineer, Building Division <br />& Manager, Engineer Services <br /> <br />Verification (Name & Date): <br /> <br />41. Prior to issuance of building permits, the City of Santa Ana sha1l determine through <br />plan reviews that a1l buildings constructed by the project applicant within the project <br />site shall adhere to the State Title 24 energy standards, which set for the n erg y <br />conservation requirements. <br /> <br />Timini of ImplementationNerification: <br /> <br />Prior to building permit issuance <br /> <br />Method of Verification: <br /> <br />Building and architectural plan checks and <br />field inspection <br /> <br />Responsible Parties: <br /> <br />Sr. Plan Check Engineer, Building Division <br /> <br />Verification (Name & Date): <br /> <br />885MMP <br /> <br />14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.