My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CALIFORNIA PACIFIC PROPERTIES 1-1990
Clerk
>
Contracts / Agreements
>
C
>
CALIFORNIA PACIFIC PROPERTIES 1-1990
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:06:54 PM
Creation date
9/6/2005 11:32:53 AM
Metadata
Fields
Template:
Contracts
Company Name
California Pacific Properties
Contract #
A-1990-102
Agency
Planning & Building
Council Approval Date
10/1/1990
Expiration Date
12/31/2025
Destruction Year
2030
Notes
Amended A-2005-195, See file for further documentation
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />"II ..~ <br /> <br />> <br />" - <br /> <br />, . <br /> <br />. . <br /> <br />~ <br /> <br />DRAIT (August 7, 1990) <br /> <br />42. Prior to issuance of building permits, the City of Santa Ana shall determine through <br />pian reviews that all appliances to be installed by the project applicant within the <br />project site shall be energy efficient in a=rdance with the California Administrative <br />. Code, Title 20, Chapter 2, Subchapter 4, Article 4. <br /> <br />Timinr of ImplementationNerification: <br /> <br />Prior to building permit issuance <br /> <br />Method of Verification: <br /> <br />Building and architectural plan checks and <br />field inspection <br /> <br />Responsible Parties: <br /> <br />Sr. Plan Check Engineer, Building Division <br /> <br />Verification (Name & Date): <br /> <br />43. The project applicant shall consult with SCE and SCG concerning energy conservation <br />programs that could be incorporated into the project during construction, <br /> <br />Timin~ of ImplementationNerification: <br /> <br />Prior to building permit issuance <br /> <br />Method of Verification: <br /> <br />Written verification from Southern <br />California Edision & Southern California <br />Gas <br /> <br />Re.~ponsible Parties: <br /> <br />Sr. Plan Check Engineer, Building Division <br /> <br />Verification (Name & Date): <br /> <br />44. Prior to building permit issuance, plans for private onsite water supply facilities to <br />serve the project (fire hydrants and water lines) shall be reviewed and approved by thc <br />City of Santa Ana Public Works Department, and shall be installed subsequently by <br />the project applicanL <br /> <br />Timinv of ImplementationNerification: <br /> <br />Prior to building permit issuance <br /> <br />Method of Verification: <br /> <br />Improvements plan check and field <br />inspection <br /> <br />Responsible Parties: <br /> <br />Sr. Plan Check Engineer, Building Division <br />& Manager, Engineer Services <br /> <br />Verification (Name & Date): <br /> <br />ilECORDEO IN OFFICIAL RECORDS <br />OF ORANGE COUNTY, CALIFORNIA <br /> <br />885MMP <br /> <br />15 <br /> <br />.2::!Q PM AUG 5 '91 <br />4 a'~RECORDEA <br />
The URL can be used to link to this page
Your browser does not support the video tag.