My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CYBERNET CONSULTING, INC. 2
Clerk
>
Contracts / Agreements
>
INACTIVE CONTRACTS (Originals Destroyed)
>
C (INACTIVE)
>
CYBERNET CONSULTING, INC. 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2015 2:45:52 PM
Creation date
9/6/2005 12:17:12 PM
Metadata
Fields
Template:
Contracts
Company Name
Cybernet Consulting, Inc.
Contract #
A-2005-076
Agency
Public Works
Council Approval Date
4/4/2005
Expiration Date
4/30/2006
Insurance Exp Date
7/25/2006
Destruction Year
2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
March 4, 2005 <br />Mr. Nabil B. Saba, PE <br />City of Santa Ana <br />Security Management System - Bid & Construction Assistance Proposal <br />Page 2 of 3 <br />Task 1— Coordinate & Attend Project Kickoff Meeting <br />Coordinate and attend a project construction kickoff meeting. Prepare and distribute minutes of the <br />meeting to attendees within 5 business days following the meeting. <br />Task 2 — Review Contractor Submittals <br />Review Contractor submittals consisting of the proposed products, bill of materials, shop drawings, <br />and installation plans for compliance with the contract specifications. Up to 2 review cycles have <br />been estimated. Subsequent to the review and approval of the submittals, review the training, and <br />operations and maintenance manuals, including as-builts. <br />Task 3—Attend Field Testing and Provide Report <br />Attend field testing of the system upon substantial completion, as requested by the City. Also <br />perform an inspection of the installation practices for adherence to the Specifications and <br />applicable codes. Provide the City with a report noting the deficiencies. Following satisfactory <br />resolution of the deficiency list, and the final acceptance test as determined by the City, review the <br />operations and maintenance manuals for completeness and compliance with the Contract <br />Specifications, and provide the City with a report stating the condition of the documents. <br />W441P71•L•141a44 <br />The engineering services enumerated in the scope of work above will be provided as per the following <br />fee estimates: <br />PART A — BID ASSISTANCE, $8,970. This fee includes an estimated 4 hours of involvement by <br />an engineering assistant at $60 per hour, 44 hours of involvement by a senior engineer at $125 <br />per hour and 22 hours of involvement by a principal engineer at $140 per hour, and a total of <br />$150 to cover mileage and other direct costs. <br />PART B — CONSTRUCTION MANGEMENT ASSISTANCE, $16,180. This fee includes an <br />estimated 16 hours of involvement by an engineering assistant at $60 per hour, 88 hours of <br />involvement by a senior engineer at $125 per hour and 28 hours of involvement by a principal <br />engineer at $140 per hour, and a total of $300 to cover mileage and other direct costs. <br />Total "not to exceed" Part A & B: $25,150.00 <br />The total estimated fee amount will not be exceeded without written authorization by the City. <br />SERVICES NOT INCLUDED <br />The following services are not included in this proposal and will be provided at an agreed upon scope <br />and fee at the City's request. <br />• Coordination, Attendance and Documentation of Progress Review Meetings <br />• Coordination of Field Activities <br />• Contractor RFIs and Change Orders <br />• Factory & Final Acceptance Testing <br />• Project Management and Administration <br />• Project Acceptance and Closeout <br />Thank you for the opportunity to submit this proposal. We are truly excited about the possibility of being <br />associated with the City of Santa Ana on a long-term basis, and look forward to being of service regarding <br />this important project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.