Laserfiche WebLink
City of Santa Ana Exhibit C -4 Acceptance Test Plan <br />1.2 General Provisions <br />❖ Contract as Final Authority: Nothing in this plan is intended nor does it, <br />supercede any term or condition established in the contract. This plan is <br />supplemental to the contract and strives to describe mutual responsibilities. <br />❖ Statement of Work: The Statement of Work sets forth the general guidance for <br />the management and conduct of the project. The Statement of Work defers to this, <br />the ATP, for matters related to testing. Similarly, no process defined here, unless <br />related to testing, is intended to nor does it supercede processes in the Statement of <br />Work. <br />Available Specifications: Current scopes of work are based on Motorola's <br />standard interface descriptions and Customer provided infrastructure descriptions <br />available at the time the Motorola proposal was submitted <br />System Tested: The system and subsystem tested refers to the Motorola provided <br />system, and proposed interfaces to non - Motorola provided system(s). For purposes <br />of test result evaluation, the failure of or unavailability of an external system shall <br />not be the basis for failing a Motorola component. <br />Exhibit C -4, Acceptance Test Plan Page C4 - 2 05/2/05 <br />CN:05 -17505 <br />This document contains Motorola and Motorola confidential, proprietary, and trade secret information <br />and may not be shared with any person or agency not directly associated with the City of Santa Ana <br />without the express written consent of Motorola, Inc., or its designees. <br />