Laserfiche WebLink
CITY OF PLEASANT HILL EXHIBIT C -6 IMPLEMENTATION PLAN <br />WIRELESS WAN DATA COMMUNICATIONS SYSTEM <br />implementation. This SOW specifically addresses the implementation of the Santa <br />Ana Fire Mesh Broadband Wireless Data Communications System project. <br />Motorola's local Systems Integration teams are highly skilled at deploying systems of <br />the size and complexity of this communications system. <br />Motorola provides a phased approach to implementation, with the following phases: <br />■ Project Initiation and Kick Off <br />■ Design Review <br />■ Civil Review <br />■ Order Processing & Manufacturing <br />■ Installation <br />■ Systems Integration & Optimization <br />■ Acceptance Testing <br />■ Cutover <br />■ Project Finalization <br />■ Warranty Support <br />As part of this proposal, Motorola is providing a very high -level engineering design, <br />which serves as the foundation for the Design Review. During the Design Review, <br />Motorola and the City Fire personnel will identify any changes required in order to <br />develop a final detailed design for the Mesh Broadband Wireless Data <br />Communications System. Design changes and changes to the scope of work will be <br />agreed to, finalized, and documented under the project change order process prior to <br />equipment ordering and manufacture. At the end of the Design Review phase, Design <br />Documents will be provided to Santa Ana Fire as early as possible so that the sites are <br />ready and available when the equipment arrives. <br />Motorola's implementation team will install and optimize the Mesh Broadband <br />Wireless Data Communications System at the Santa Ana sites. Motorola's <br />implementation includes the integration of all proposed subsystems to provide an end - <br />to -end solution. To close the loop between proposed functionality with the deployed <br />system, Motorola will execute Acceptance Testing according to an Acceptance Test <br />Plan (ATP). The ATP includes Installation Acceptance and Functional Performance <br />Tests. <br />Exhibit C -6, Implementation Plan Page C6 - 2 05/2/05 <br />CN: 05 -17505 <br />Proposal: B05- 000211 <br />This document contains Motorola and Motorola confldental, proprietary, and trade secret information and may not be shared with any <br />person or agency not directly associated with the City of Santa Ana without the express written consent of Motorola, Inc., or its <br />designees. <br />