My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MOTOROLA, INC. 2 - 2005
Clerk
>
Contracts / Agreements
>
M
>
MOTOROLA, INC. 2 - 2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2017 2:37:19 PM
Creation date
9/8/2005 3:29:01 PM
Metadata
Fields
Template:
Contracts
Company Name
Motorola, Inc.
Contract #
A-2005-097
Agency
Police
Council Approval Date
5/2/2005
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
206
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF PLEASANT HILL EXHIBIT C-6 IMPLEMENTATION PLAN <br />WIRELESS WAN DATA COMMUNICATIONS SYSTEM <br />i Santa Ana Fire will meet client hardware and software requirements for the <br />proposed system. Loading and configuration of the client hardware, operating <br />system, drivers and middleware will be the primary responsibility of Santa Ana <br />Fire. Motorola will provide engineering assistance to Santa Ana Fire for two <br />client configurations. <br />■ Santa Ana Fire will provide network access, uninterrupted power supply (UPS) <br />devices etc where required. <br />■ Spares are not included in this proposal <br />1.7.4 Communications Links <br />Facilities Access <br />This proposal assumes free access to all sites and facilities required during the <br />project. Santa Ana Fire will supply appropriate access of all sites and facilities. <br />Shipping and Storage <br />No storage facilities have been quoted within the project. Santa Ana Fire will <br />provide facilities with proper access, security, lighting, and power, for the <br />duration of the project. This facility shall be appropriately sized to accept all <br />communications equipment, antenna systems, ancillary parts, etc., as identified <br />in the final equipment list. <br />System Cutover <br />A detailed cutover plan will be developed in close consultation with Santa <br />Ana Fire. Santa Ana Fire delays during cutover may constitute project delay. <br />Any delays or additions to the proposed scope of work will be handled under a <br />change order. <br />Replacement/Removal of Existing Fixed Network Equipment (FNE) <br />No existing equipment removal or relocation is quoted. <br />Exhibit C -6, Implementation Plan Page C6 - 9 05/2/05 <br />CN: 05 -17505 <br />Proposal: B05- 000211 <br />This document contains Motorola and Motorola confidential. proprietary, and trade secret information and may not be shared with any <br />person or agency not directly associated with the City of Santa Ana without the express written consent of Motorola, Inc., or its <br />designees. <br />
The URL can be used to link to this page
Your browser does not support the video tag.