Laserfiche WebLink
CITY OF PLEASANT HILL <br />WIRELESS WAN DATA COMMUNICATIONS SYSTEM <br />EXHIBIT C -6 IMPLEMENTATION PLAN <br />Santa Ana Fire is responsible for the performance of all existing and Santa Ana Fire <br />provided hardware that will be interfaced with or integrated into the various subsystem <br />implementations for this project. <br />1.7 ASSUMPTIONS <br />1.7.1 Project Schedule <br />Motorola intends to complete the project as efficiently as possible, in the interest of all <br />parties. The project schedule will be reviewed in detail at the Design Review with <br />Santa Ana Fire. An agreed upon final project schedule will be provided after the <br />Design Review. <br />1. 7.2 RF System Design <br />Since 802.1 lb and 802.11g WLANs reside in the 2.4 GHz unlicensed (ISM) radio <br />frequency band, other products that transmit energy in the same frequency spectrum <br />can potentially provide some measure of interference. Other products that might cause <br />interference in the 2.4 GHz band are: microwave ovens, Bluetooth enabled devices, <br />cordless phones, HomeRF, and the co- location of multiple wireless LANs. Therefore <br />coverage and interference of a system using the 2AGHz unlicensed band can not be <br />guaranteed. <br />Should interference occur from outside sources, Motorola can provide additional <br />analysis, measurement, and recommendation services to improve or correct such <br />interference through a Change Order to the project. <br />1.7.3 Technical Assumptions <br />The following technical assumptions were taken into consideration during the <br />development of this proposal: <br />i hi the absence of application and load profiles Motorola has designed the <br />system to perform at a certain average bit rate. This bit rate corresponds to <br />Motorola's best estimate of required throughput in order to support the anticipated <br />applications. <br />■ All applications can run over an IP network <br />K Where available, Santa Ana Fire will allow the use of Frame Relay, TI or <br />other network infrastructure(s) for backhaul purposes. This design assumes Santa <br />Ana Fire will provide T -I connectivity for backhaul from all Fire Stations. <br />Exhibit C -6, Implementation Plan Page C6 - 8 05/2/05 <br />CN: 05 -17505 <br />Proposal: B05- 000211 <br />This document contains Motorola and Motorola confidential, proprietary, and trade secret information and may not W shared with any <br />person or agency not directly associated with the City of Santa Ana without the express written consent of Motorola. Inc., or its <br />designees. <br />