Laserfiche WebLink
CITY OF SANTA ANA <br />EXHIBIT C -7 ACCEPTANCE TEST PLAN <br />1. ACCEPTANCE TEST PLAN <br />This section describes a test plan to determine that Motorola has met the particular <br />requirements of the contract with the City of Santa Ana Fire. Detailed acceptance test <br />procedures will be provided as part of the design review phase of the project. Under <br />the direction of the Motorola Project Manager, teams consisting of representatives <br />from the City of Santa Ana Fire and Motorola will execute agreed -upon Functional <br />Acceptance Test procedures to confirm that the system has been designed and <br />installed to meet all of the features and performance capabilities agreed upon in the <br />contract. <br />1.1 ACCEPTANCE TEST PROCEDURES (ATPS) <br />This test plan reflects the extent of the testing to be provided to the City of Santa Ana <br />Fire. Any changes to these plans may result in a change to the scope of this proposal <br />and the Motorola Project Manager may issue a change order for the additional testing <br />time required. Each test will begin on the date agreed upon by Motorola and the City <br />of Santa Ana Fire as stated within the project schedule. The following sections <br />describe the Functional Acceptance tests to be provided as part of this proposal. More <br />detailed descriptions of these tests will be provided as part of the design review phase <br />of the project. <br />1.1.1 Functional Acceptance Testing <br />This field functional test is conducted to ensure that the system meets the requirements <br />as stated within the contract. The test will begin on the date agreed upon by Motorola <br />and the City of Santa Ana Fire as stated within the project schedule. After the test has <br />been completed, the test procedure documents will be submitted as part of the system <br />manual. <br />During test conduct, all measurements or outcomes will be recorded within the test <br />procedure, if indicated, resulting in either a "Pass" or "Fail'. <br />a Pass--A check mark in the "Pass" field or in the appropriate box will be <br />sufficient to indicate that a step has passed the test. When all steps in a specific <br />test pass, a representative from Motorola and the City of Santa Ana Fire will <br />sign the test procedure form to indicate the system has passed that test. <br />■ Fail —If a failure occurs, a check will be placed in the fail column within the <br />test procedure, and an entry made on a punch list. The punch list will include <br />Exhibit C -7, Acceptance Test Plan Page C7 - 1 05/2/05 <br />CN: 05 -17505 <br />\Proposal: B05-000211 <br />This document contains Motorola and Motorola confidential, proprietary, and trade secret information and may not be shared with any <br />person a agency not directly associated with the City of Santa Ana without the express written consent of Motorola, Inc., or its <br />designees. <br />