Laserfiche WebLink
City of Santa Ana Exhibit C -3 Statement of Work <br />1.16.2 Customer Responsibilities <br />a. Participate in the functional testing and generate data files needed for testing. <br />1.16.3 Completion Criteria <br />This task is considered complete when each primary subsystem has been demonstrated <br />to operate in accordance with the Acceptance Test Plan. <br />1.17 Final Equipment Installation <br />The objective of this task is to install all remaining cables, modems, hubs, routers, <br />printers, workstations, and other equipment required for production operation. Prior to <br />System Acceptance Testing, all remaining computer, communications, and related <br />components will be installed. <br />1.17.1 Motorola Responsibilities <br />a. Deliver all remaining Motorola - supplied equipment. <br />b. Install all remaining Motorola- supplied network, cabling and associated <br />equipment. <br />1.17.2 Customer Responsibilities <br />a. Provide, configure, and install all remaining equipment not provided by Motorola <br />prior to Motorola's arrival for monitoring subsystem integration testing. <br />b. Install all workstations in their production locations. <br />c. Complete any required console and related modifications. <br />d. Provide and install all network cables not provided by Motorola and verify both <br />network and PC operation. <br />e. Perform any site modifications to allow successful equipment installation. <br />f. Provide and install all necessary UPS equipment not provided by Motorola. <br />g. Install and verify the operation of all Customer - installed workstation operating <br />system software. <br />Exhibit C -3, Statement of Work Page C3 - 18 05/2/05 <br />CN: 05 -17505 <br />This dowment contains Motorola and Motorola confidential, proprietary, and trade secret information and may not be shared with any <br />person or agency not directly associated with the City of Santa Ana without the express written consent of Motorola, Inc., or its <br />designees. <br />