My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MOTOROLA, INC. 2 - 2005
Clerk
>
Contracts / Agreements
>
M
>
MOTOROLA, INC. 2 - 2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2017 2:37:19 PM
Creation date
9/8/2005 3:29:01 PM
Metadata
Fields
Template:
Contracts
Company Name
Motorola, Inc.
Contract #
A-2005-097
Agency
Police
Council Approval Date
5/2/2005
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
206
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
of Santa Ana Exhibit C -3 Statement of Work <br />1.21 System Acceptance Testing <br />The objective of this task is to perform system, performance and integration testing of <br />each subsystem and interfaces by demonstrating all system functionality and internal <br />and external interfaces to ensure that the combined subsystems operate as defined in <br />the product documentation and the IDDs, based on the Acceptance Test Plan. <br />Customer staff will participate in all testing conducted at Customer's facilities. <br />1.21.1 Motorola Responsibilities <br />a. Certify the system as ready for integration testing. <br />b. Demonstrate all system functionality according to the product documentation, <br />IDDs, and the Acceptance Test Plan. <br />c. Demonstrate all inter - system communications between installed Motorola systems <br />and between Motorola and non - Motorola systems, according to the product <br />documentation, IDDs, and the Acceptance Test Plan. <br />d. Review and provide software or documentation corrections for discrepancies that <br />are identified by the Customer according to the resolution criteria established in <br />the Acceptance Test Plan. <br />1.21.2 Customer Responsibilities <br />a. Conduct test procedures and verify all inter - system communications between <br />installed Motorola systems and non - Motorola systems to ensure conformance with <br />the approved product documentation, and the IDDs. <br />b. Identify in writing each discrepancy in system functionality and between <br />subsystem and ancillary system functionality and the product documentation, and <br />the IDDs within ten (10) business days. <br />c. Work with Motorola to identify the type of correction needed, according to the <br />resolution criteria in the Acceptance Test Plan, to ensure that each subsystem and <br />ancillary system conforms to the product documentation and the IDDs. <br />1.21.3 Completion Criteria <br />This task is considered complete when the system functionality and internal and <br />external interfaces and other Motorola licensed software described in this Agreement <br />has been verified operational according to the product documentation and the IDDs. In <br />the event the performance of an internal or external interface cannot be demonstrated <br />due to factors beyond Motorola's control, i.e., the availability of connectivity to an <br />Exhibit C -3, Statement of Work Page C3 - 42 05/2/05 <br />CN: 05 -17505 <br />This document contains Motorola and Motorola confidential, proprietary, and trade secret information and may not be shared with any <br />person or agency not directly associated with the City of Santa Ana without the express written consent of Motorola, Inc., or its <br />designees. <br />
The URL can be used to link to this page
Your browser does not support the video tag.