My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75A - 606 S. EUCLID ST.
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2005
>
09/19/2005
>
75A - 606 S. EUCLID ST.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:52:21 PM
Creation date
9/14/2005 11:26:14 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
75A
Date
9/19/2005
Destruction Year
2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Euc~id Street Zone Change/Subdivision ER 2005-138 <br /> <br />Mitigation Measure <br /> <br />. <br /> <br />Grading plans for the proposed project shall <br />that Best Management Practices would be <br />during construction operations to minimize <br />impacts. <br /> <br />identify <br />employed <br />erosion <br /> <br />C. Would the project result in the loss of a unique <br />geological feature? <br /> <br />No Impact <br /> <br />According to the City's General Plan Land Use Element EIR, <br />the project site does not contain any unique geologic <br />features. Therefore, implementation of the proposed project <br />would not result in adverse impacts to any unique geologic <br />feature. <br /> <br />D. Is the project located on strata or soil that is <br />unstable or that would become unstable as a result of <br />the project and potentially result in on-or off-site <br />landslide, lateral spreading, subsidence, liquefaction <br />or collapse? <br /> <br />Potentially Significant Unless Mitigation Incorporated <br /> <br />According to the City's General Plan Land Use Element EIR <br />soil conditions on the project site consist of Metz loamy <br />Sand Soils. Based on the soil conditions on the project <br />site, the proposed project is geotechnically feasible. The <br />project would be required to prepare a site geotechnical <br />report that considers the soil conditions on the project <br />site with the building load requirements of the project and <br />if needed identify design recommendations to ensure the <br />geotechnical stability of the project. <br /> <br />Mitigations Measures <br /> <br />· Prior to issuance of grading permits, the project <br />developer shall submit a site specific geotechnical <br />study the addresses the soil constraints on the <br />project site and the building load requirements of the <br />project. <br /> <br />E. <br /> <br />Where sewers <br />wastewater is <br /> <br />are not available for the disposal of <br />the soil capable of supporting the use <br /> <br />12 <br /> <br />75A-31 <br />
The URL can be used to link to this page
Your browser does not support the video tag.