Laserfiche WebLink
<br />Euclid Street Zone Change/Subdivision ER 2005-138 <br /> <br />Construction operations for the proposed project would <br />involve conventional construction equipment and building <br />practices. No significant vibration impacts would result <br />from construction operations. Additionally, the operation <br />of the proposed project would not result in any long-term <br />vibration impacts. <br /> <br />D. A substantial temporary or periodic increase in <br />ambient noise levels in the project vicinity above <br />levels existing without project. <br /> <br />Potentially Significant Unless Mitigation Incorporated <br /> <br />Short-term noise impacts are impacts associated with site <br />preparation, excavation, grading, and construction of the <br />proposed project. The construction-related short-term noise <br />levels would be higher than the existing or ambient noise <br />levels in the project area, but would no longer occur once <br />construction of the project is complete. The City's <br />Municipal Code recognizes that some forms of noise are <br />required for urban development and maintenance and are <br />difficult to control. Section 18-314(e) exempts noise <br />sources associated with construction, repair, remodeling, <br />or grading of any real property, provided said acti vi ties <br />do not take place between the hours of 8:00 p.m. and 7:00 <br />a.m. on weekdays, including Saturday, or any time on Sunday <br />or a federal holiday. <br /> <br />While adverse, construction, when performed in compliance <br />wi th the requirements of the Municipal Code is typically <br />considered to be less than significant. However, <br />construction noise associated with the proj ect would have <br />the potential to create nuisance noise at nearby <br />residential land uses. To minimize short-term construction <br />noise impacts the following mitigation measures shall be <br />implemented. <br /> <br />Mitigation Measures <br /> <br />· Grading Plans and Building Plans for the proposed <br />project shall note that construction activities on the <br />project site shall not take place between the hours of <br />8:00 p.m. and 7:00 a.m. on weekdays, including <br />Saturday, or any time on Sunday or a federal holiday. <br /> <br />· No construction equipment on the project site shall <br />operate including warming up until after 7:00 a.m. <br /> <br />21 <br /> <br />75A-40 <br />