My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75A - 606 S. EUCLID ST.
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2005
>
09/19/2005
>
75A - 606 S. EUCLID ST.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:52:21 PM
Creation date
9/14/2005 11:26:14 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
75A
Date
9/19/2005
Destruction Year
2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Euc~id Street Zone Change/Subdivision ER 2005-138 <br /> <br />construction of new water distribution facilities, impacts <br />on water service would be less than significant. <br /> <br />A. Exceed wastewater treatment requirements of the <br />applicable Regional Water Quality Control Board? <br /> <br />E. Result in the determination by the wastewater <br />treatment provider, which serves or may serve the <br />project that it has adequate capacity to serve the <br />project's projected demand in addition to the <br />providers existing commitments. <br /> <br />Less Than Significant Impact <br /> <br />The project area is improved with exiting wastewater <br />distribution facilities. Wastewater service for the <br />proposed proj ect would be provided by, the City of Santa <br />Ana and the Orange County Sanitation District (OCSD). <br />Wastewater from the project would be treated at the OCSD <br />treatment plant No. 1 in the City of Fountain Valley. The <br />wastewater demands for the project are accounted for in the <br />Ci ty' s Urban Water Management Plan. The wastewater flows <br />generated from the proposed project would provide an <br />incidental increase in the amount of wastewater flows to <br />the Fountain Valley treatment plant and would not have a <br />significant impact on wastewater treatment facilities. <br />However, to adequately service the proposed project new <br />wastewater distribution facilities would be needed. The <br />proposed project would be subject sewer connection fees <br />with the City of Santa Ana and the Orange County Sanitation <br />District. With the payment of sewer connection fees and the <br />construction of new wastewater distribution facilities, <br />impacts on wastewater service would be less than <br />significant. <br /> <br />C. Require or result in the construction of new storm <br />water drainage facilities or expansion of existing <br />facilities, the construction of which could cause <br />significant environmental effects? <br /> <br />Less Than Significant Impact <br /> <br />Implementation of the proposed project would not <br />significantly increase the amount of surface water runoff <br />currently generated from the project site. The project <br />would include the development of onsite drainage systems. <br /> <br />28 <br /> <br />75A-47 <br />
The URL can be used to link to this page
Your browser does not support the video tag.